Laserfiche WebLink
Implementation Responsible <br /> Mitigation Measure Source Schedule Party Status I Date I Initials <br /> 4 Nesting Bird Assessment and Avoidance:Prior to the initiation of Project activities,including CDFW Before commencing Project <br /> ground disturbing activities scheduled to occur between February 15 and September 15,a CEQA ground-or Proponent <br /> Qualified Biologist shall conduct a habitat assessment and nesting survey for nesting bird Comment vegetation-disturbing <br /> species no more than five(5)days prior to the initiation of work Surveys shall encompass all Letter activities/ <br /> potential habitats(e.g.,grasslands and tree cavities)within 250 feet of the Project site.The Entire Project <br /> Qualified Biologist conducting the surveys shall be familiar with the breading behaviors and nest <br /> structures for birds known to nest in the Project vicinity.Surveys shall be conducted during <br /> periods of peak activity(early morning,dusk)and shall be of sufficient duration to observe <br /> movement patterns.Survey results,including a description of timing,duration and methods <br /> used,shall be submitted to CDFW for review forty4ght(48)hours prior to the initiation of the <br /> projecL If a lapse in Project activity of seven days(7)or more occurs,the survey shall be <br /> repeated,and no work shall proceed until the results have been submitted to CDFW. <br /> If nesting birds are found,then no work shall be initiated until nest-specific buffers have been <br /> established with written approval from CDFW.The buffer area(s)shall be fenced off from work <br /> activities and avoided until the young have fledged,as determined by the qualified biologist. <br /> Active nests within or adjacent to the Project site shall be monitored by the qualified biologist <br /> daily throughout the duration of Project activities for charges in bird behavior or signs of distress <br /> related to Project activities.If nesting birds are showing signs of distress or disruptions to <br /> nesting,then that nest shall have the buffer immediately increased by the qualified biologist until <br /> no further interruptions to breeding behavior are detectable. <br /> The Permittee or representatives of the Permittee shall not disturb or destroy the nests or eggs <br /> of fully protected species or of other birds as per Fish and Game Code section 3503. <br /> DURING CONSTRUCTION <br /> 5 Open Pipes Restriction:All pipes,culverts,or similar structures that are stored at the CDFW Entire Project Project <br /> construction site(either vertically or horizontally)for one or more overnight periods will be CEQA Proponent <br /> securely capped on both ends prior to storage and thoroughly inspected for wildlife prior to Comment <br /> implementation by a Qualified Biologist- Letter <br /> 6 Fence and Signpost Restriction:Any fencing posts or signs installed,temporarily or CDFW Entire Project Project <br /> permanently,throughout the course of the Project shall have the top three post holes covered or CEQA Proponent <br /> filled with screws or bolts to prevent the entrapment of wildlife,specifically birds of prey. Comment <br /> Letter <br /> 2 <br />