B. SOIL PHYSICAL CHARACTERISTICS <br /> The surface and subsurface soil investigation and testing began with hand-drilling one 12",one24" and one <br /> 36" deep percolation test borings in the proposed mound system effluent disposal location. The surface soils <br /> to a depth of 12" is a dark browniblack,high clay and organic matter content soil with 3.4"fissures caused by <br /> clay cracking. From 12" to 24",the soil is a tight,yellowish light brown,silty clay-clayey silt material <br /> exhibiting the slowest permeability characteristics of the three test depths. Below 24",the soil is a dark <br /> brown,tight, lean clay. <br /> The length of the subject property is 1,150 It S-N with an elevational drop of-12 ft,so the property has a <br /> northerly downward slope of slightly less than 1%grade. One percent grade is the maximum slope for the <br /> installation of a mound system without having to take mitigating design factors into consideration. On grades <br /> greater than I%, effluent can congregate on the downward side of a mound which must be compensated for <br /> through design modifications. <br /> The United States Department of Agriculture-Soil Conservation Service(USDA-SCS) indicates the on-site <br /> soils to consist of Stomar Clay Loam. This soil type is classified as a lean clay with some silt. Permeability <br /> is very slow, as was observed in the percolation testing. <br /> C. PERCOLATION TEST RESULTS <br /> The percolation tests were completed in the locations depicted in the Site Plan found in Appendix B. The <br /> three test depths are referenced above, =aveeability <br /> tively detailed observation of subsurface , <br /> permeability in these three strata. Onlydepth is recognized as`official'by EHD. The test <br /> depths can be considered to represent throughout the effluent receiving soil profile. <br /> On July 16,2012,the three perc test borings were drilled in the referenced locations. The sidewalis of each <br /> boring were scored with a pry-bar to open potentially smeared sidewalls. Two inches of pea gravel was <br /> placed at the bottom and three-inch perforated PVC pipe was inserted in each test boring. Each boring was <br /> then pre-saturated with water at 3x each bore hole volume at 0900 hrs,24 hrs before the start of testing. This <br /> greatly exceeds EHD pre-saturation standards. <br /> On July 17,2012,percolation testing commenced No standing water was observed after the 24-hr soak <br /> �_pel_iod in any of the three tos+"s. Consequently,EHD Pere Test Procedure#2 was conducted in which <br /> testing was done over a four hour 'od to induce maximum soil saturation. A summary of the perc test <br /> 1,7 <br /> results with corresoenditlgappljpa ton rates in gallons of effluent accepted per square foot of soil,per day are <br /> found in Table 1 below for the proposed disposal area: <br /> TABLE 1 <br /> PERCOLATION TEST RESULTS FOR THE DISPOSAL AREA MOUND SYSTEM WITH <br /> CORRESPONDING APPLICATION RATES IN GALLONS/FT'/DAY <br /> 12 INCH DEEP PERC TEST BORING 41.7 min/inch / 0.472 gallons/ft/day <br /> PERCOLATION RATE/APPLICATION RATE <br /> 24 INCH DEEP PERC TEST BORING 83.3 min/inch / 0.235 gallons/ft'/day <br /> PERCOLATION RATE/APPLICATION RATE <br /> F36 INCH DEEP PERC TEST BORING PERCOLATION 62.5 'nhnch / 0.335g <br /> RATE/APPLICATION RATE <br /> AMhcetiwi Rates adaraed from Caff�'a Smte W'mer Resamees Cauca!Board Guidelmesfi� the De.+tgn of Mound Seenge Samemv and L bead m the Pm R W. <br /> 3 <br />