My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008455 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
16215
>
2600 - Land Use Program
>
PA-1000217
>
SU0008455 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:31 AM
Creation date
9/5/2019 10:43:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0008455
PE
2626
FACILITY_NAME
PA-1000217
STREET_NUMBER
16215
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
20919033
ENTERED_DATE
9/23/2010 12:00:00 AM
SITE_LOCATION
16215 W GRANT LINE RD
RECEIVED_DATE
9/23/2010 12:00:00 AM
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\16215\PA-1000217\SU0008455\NL & LIQ PLN CK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sprinkler irrigation over the mound system must be carefully considered so as to not inundate the disposal <br /> area. During the spring and summer months,irrigation should be done intermittently during the day and/or <br /> evening-hours. For example,the sprinklers could run for five minutes,six times per day. Irrigation during <br /> the wintertime abould btsuspended. <br /> Another source of nitrate loading can be from the lawn grass that may be planted over the mound system <br /> area. It is recommended not to use any nitrogen fertilizer over the mound system. <br /> Accurate"as-builts"of the septic system installation must be supplied to the Environmental Health <br /> Department by the septic system contractor/installer. All applicable"distance"and"setback"requirements <br /> must be strictly followed. <br /> It is imperative to recognize that all septic systems and disposal areas have a lifespan. This lifespan is <br /> unpredictable due to the numerous operational and environmental factors involved. A critical lifespan issue <br /> is controlling the on-site water use as much as possible. Water flows must be at an absolute minimum. The <br /> control panel for the quad pump system will total the volume of wastewater pumped and consequently the <br /> volume of domestic water used. If this volume exceeds the calculated ADF of 2,400 gpd, adjustments must <br /> be made to on-site water usage. Restricting water use also includes checking.for water leaks in toilets, <br /> dripping faucets,etc.on a regular monthly basis. <br /> VI. LIMITATIONS <br /> The findings,opinions and conclusions of this report are based upon information from standard engineering <br /> and analytical test procedures,contemporary scientific literature and agency consultations. Information in <br /> this report is deemed reliable by the sources from where it was obtained. Results of the percolation testing <br /> should be assumed to only represent the subsurface conditions encountered in the specific area of testing <br /> and not of the entire proposed mound system area to serve the expansion of the Gurdwara Gur Nanak <br /> Parkash Sikh Temple. The specific design components for the Temple's domestic wastewater disposal <br /> system are subject to change. <br /> This report is based upon current scientific knowledge to assess factors which are extremely variable and <br /> complex within the environment. Although there are several methods to size and predict environmental <br /> impact from a septic system,San Joaquin County Environmental Health Department Sewage Standards and <br /> requirements have been employed for these purposes,and for this project. Therefore,no guarantee or <br /> warranty concerning any aspect of this report or design,is expressed or implied. <br /> The opportunity to provide this service for you is appreciated. If there should be any questions regarding to <br /> the information contained within this report,please contact the undersigned. <br /> Respectfully submitted, <br /> 4Lofesslaa <br /> PROV T&PRITCHARD CONSULTING GROUP ea 9• Ckes BjF <br /> „ No.75479 r° <br /> a 13tp.June 3%201-1 ^ <br /> Don Chesney,PE <br /> Registered Civil Engineer 75479 '$ Civil .10 <br /> ire of Cali4oso <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.