Laserfiche WebLink
SITE EVALUATION <br /> SITING <br /> GROUND WATER <br /> `. <br /> DETERMINATON } <br /> STANDARDS <br /> . <br /> LAMP MUST PROVIDE <br /> DESIGN SCOPE OF COVERAGE <br /> & PLEASE NOTE LAMP CANNOT INCLUDE (section 9.4): <br /> �. CONSTRUCTION <br /> _ ^^r`` SLOPES >30% W/O APPROVAL BY REGISTERED <br /> STANDARDS PROFESSIONAL <br /> DISPERSAL FIELDS <2'TO GW; SEEPAGE PIT <10'TO GW <br /> _ OWTS WHERE PUBLIC SEWER IS AVAILABLE (SEE <br /> - — = SECTION 9.4.9 AS AMENDED). <br /> OWTS WITHIN SPECIFIED DISTANCES TO PUBLIC WATER <br /> �•- <br /> WELL/SURFACE WATER INTAKE, EXCEPT AS PROVIDED <br /> Qrt <br /> - <br /> (SEE SECTIONS 9.4.10, 9.4.11, and 9.4.12) <br /> Minutes/Inch Gal/Ft2/Day <br /> 13 0.757 <br /> 14 0.743 -""� <br />