C N a O _ C
<br /> CT SCREW ON CAP p � a
<br /> 00�� 0 �
<br /> �. �oa� op,
<br /> 4" PVC SCH 40 OBSERVATION TUBE > �N a p N
<br /> 0
<br /> ow a as o 0 o o o o cw
<br /> Q W U -a U O" � N 2-'-8
<br /> a 3 W
<br /> a
<br /> ~� a o C� o �o �.3
<br /> = C - -1.- -�_. � ao
<br /> W U W O.0 >= _ to E U-a
<br /> 1.5' DEPTH OF LOAM CAP ��� � N�O3 � UaU=
<br /> 1.0' DEPTH OF LOAM oQ= oma N To a� o-
<br /> AT CENTER OF DRAIN ROCK 2" > o o
<br /> 1„ AT EDGE OFDRAINROCK oz i 2 3 o a o 'o
<br /> GEOTECHNICAL FABRIC 1 tea_ > - >
<br /> 100 RESERVE/REPLACEMENT AREA ��N a� N - a
<br /> Noo aoEaE � v o0
<br /> ��d T� O O OLE,
<br /> E— >' a) N
<br /> TO BE INSTALLED UPON PRIMARY DISPOSAL AREA FAILURE DRAIN ROCK DEPTHS �z o�.a = Qw Qw o_�
<br /> �w � axQ�o a a'oaa ID
<br /> �W a a TN'- OLS a
<br /> }Z w 15y--�= C1 i
<br /> 1" PVC SCH 40 6" 0 N C p � E U C� U 0 7 U
<br /> - C
<br /> �j L p a)= a a) a O w
<br /> LATERALS (TYP.)
<br /> N
<br /> 1.5' DEPTH OF FILL SAND N �
<br /> Q
<br /> PERFORATIONS N
<br /> NATIVE SOIL M
<br /> M
<br /> 215'
<br /> if
<br /> SCALE IN FEET
<br /> Ld
<br /> LIMITS OF OBSERVATION TUBE (4) 1.5" PVC SCH 40 MANIFOLD LINE FILL AND CAP GEOTECHNICAL
<br /> DRAIN ROCK OFFSET 1' FROM SOUTH MANIFOLD LINE MANTECA LOAM (TYP.) FABRIC o 3 6 12
<br /> w=
<br /> w.
<br /> .s
<br /> BLOCK MASONRY _ •; _ _
<br /> 0
<br /> • �itA
<br /> - Cn
<br /> 2 PVC SCH 40
<br /> 2 COURSE -
<br /> AROUND PERMETER TRANSPORT LINE w
<br /> SOIL-EFFLUENT �
<br /> o INTERFACE SCARIFY SOIL
<br /> ELEVATION VIEW 8"-10" DEEP
<br /> W
<br /> W
<br /> ls'-0.00' Drninfield S !zing Specifications FILL WITH GROUT (TYP.) Z
<br /> Q
<br /> 500 linear feet treat up to 60(gallons per day TWO COURSE BLOCK
<br /> 4
<br /> LateralsAD, MASONRY 8"x8"x16"
<br /> PBS-lND-60 0 d'alnfleld Is rade of twelve 42'Imes p
<br /> 0 I 3'-0.00' ) I 3 Each line
<br /> m O'Hssecction Ir�cludesOtwo orriifices
<br /> Z
<br /> LIMITS OF MOUND 1.5" PVC SCH 40 MANIFOLD LINE O Orifice Specifications p��'centers
<br /> of allllnes (TYP.)
<br /> GROUT TYP.
<br /> SYSTEM Orifice Specifications
<br /> Orlflce diameter=5/32'
<br /> �
<br /> offIcesaree6W0 psperlant
<br /> lner8 NATIVE SOIL FINISH GRADE �ER
<br /> Pioino a' d d a a. d d /fie t'/'Z\/�\/�� /\` _IV `� d0
<br /> NIfoldLweral =2D'SCH 40 PVC a .^ "a • , c � dam• i Q
<br /> nternls=Lo'SCH 40 PVC a
<br /> LO
<br /> xo 1 1'x1' CONCRETE FOOTING W U U
<br /> Orifice Shields
<br /> First 7 up last one down 0 J HOOKS 32„ O.C. 1
<br /> Q 2.0'Manifold Assembly 1 — 2' #4 BAR �`y��S�q SSP
<br /> rB Inlet
<br /> FOUR P-TE-50 D NEW 1600 GALLON P&L BLOCK MASONRY
<br /> 1/2 HP TURBINE PUMPS IN f CONCRETE-2 COMPARTMENT Manifold 1'Sweep Assembly W
<br /> FILTERED PUMP VAULT SEPTIC/DOSE TANK EXISTING MOUND SYSTEM Quanics Model#PDS-SA-1.0
<br /> w
<br /> O ALL DRAIN ROCK AND SAND TO BE e �
<br /> HAULED OFF TO LANDFILL PER SJCEHD e
<br /> w
<br /> #4 REBAR CONTINUOUS FILL WITH GROUT (TYP.) = Q
<br /> Ll DETAIL B � � z
<br /> DETAIL A TOE OF MOUND SYSTEM GROUT (TYPA .)
<br /> 4” PVC SCH 40 APPROX. 450 FT. 4" PVC SCH 40 APPROX. 450 FT. �W J
<br /> DIMENSIONS ARE M INCHES MAME � � � 4: � = Z
<br /> CLEAN-OUTS EVERY 100 FT. CLEAN-OUTS EVERY 100 FT. TOLERANCES, OwAwN TNJ 05-10-� Quanics : ' ' �— Cn
<br /> Quanics Contacts FRACTIONAL t CD
<br /> Brian Borders,R.S. ANGULAR-MACH t BOND t CHECKED BB Os-10-M ,
<br /> 502-992-8214 TWO PLACE DECIMAL = ENGAPE KS 00-GO-00 NATIVE SOIL FINISH GRADE � LL O
<br /> bborders2quanlcs,net THREE PLACE DECIMAL t MFGAe7R 05-10-06 P.Q.$a%1520 N
<br /> Ton Pettyy P.G.,R.E.H.S MATERIAL G.A. Crestwood KY 40014 LLJ
<br /> 615-289-4J99
<br /> Tpetty8quanics,net Product(s)covered by one or cowEw s www,quanics,net /� z o
<br /> Kevin Sherman,P.E.,Ph.D. more U.S.and/or International ISH ,•.
<br /> stents,Other U.S.and NE%T ASSY USED ON -- SIZE DESCRIPTIR /'►
<br /> 502-751-7258 p A PDS-MND -60 0 a: ! , V J o
<br /> ksherman@quanlcs,net International patents may be APPLICATION S[oiE /� U
<br /> pending. vEtan am I r I / i , ,
<br /> 0 /� 1x1 CONCRETE FOOTING Q CD � < (�/)
<br /> SCALE: NTS 1 = 2'
<br /> ZQQ 0 Q z
<br /> EXISTING 3 SEPTIC A C z Lj z Z
<br /> Un <
<br /> PERTANKSJCOEHDE STANDARDS MOUND SYSTEM BLOCK MASONRY ~ V) o w
<br /> (D Ln Cn
<br /> NEW 2000 GALLON P&L SEPARATION DISTANCE SEPARATION DISTANCE NEW 2000 GALLON P&L DRAWINGNAME-SS-200-D-44-PF NOTES 0
<br /> SEPTIC TANK-2 COMPARTMENT TO BE DETERMINED TO BE DETERMINED SEPTIC TANK-2 COMPARTMENT STEP SYSTEM-44"PUMPVAULT-DUAL1/2 HP TURBINE PUMPS-PRESSURE FILTERS 1. TANKS: TOTAL OF SIX NEW TANKS (ALL P&L CONCRETE, INC.): TWO, 2,000 GALLON, THREE COMPARTMENT <
<br /> WITH POLYLOK EFFLUENT FILTER IN THE FIELD IN THE FIELD WITH POLYLOK EFFLUENT FILTERA GREASE INTERCEPTOR TANKS WITH POLYLOK PL-625 FILTERS AT THE OUTLETS BEFORE EFFLUENT GRAVITY W
<br /> O O O FLOWS INTO THE MIDDLE TWO TANKS. MIDDLE TWO TANKS: 2,000 GALLON, TWO COMPARTMENT SEPTIC TANKS. 0 =
<br /> zs.00• 26 LID POLYLOK FILTER (ZABEL) A300 8X32 VC25 IS TO BE INSTALLED AT THE OUTLET OF THESE TANKS BEFORE
<br /> JUNCTION BOX EFFLUENT GRAVITY FLOWS INTO THE FINAL TWO, 2,000 GALLON, TWO COMPARTMENT SEPTIC TANKS, ALSO WITH C D o
<br /> O O O POLYLOK (ZABEL) A300 8X32 VC25 FILTERS.
<br /> 2. EFFLUENT GRAVITY FLOWS FROM LAST TWO SEPTIC TANKS IN 4 PVC SCH 40 LINES TO DOSE TANK DIRECTLY 00 , �+ o
<br /> 26"x 18"RISER • tl3 N ca N (n
<br /> SOUTH OF MOUND SYSTEM. INSTALL CLEAN-OUTS EVERY 100 FT AS NOTED. ^^''
<br /> NEW 2000 GALLON P&L NEW 2000 GALLON P&L PRESSURE FILTERS 3. DOSE TANK: P&L CONCRETE, INC. 1,600 GALLON, TWO COMPARTMENT SEPTIC TANK, SECOND COMPARTMENT TO L.G.. • Ln
<br /> SEPTIC TANK-2 COMPARTMENT SEPTIC TANK-2 COMPARTMENT (optional) o W�, o
<br /> BE PUMP CHAMBER. C f� C) ~ � o
<br /> WITH POLYLOK EFFLUENT FILTER WITH POLYLOK EFFLUENT FILTER 26'x2"RETROFIT a N Q a' o �
<br /> O O O TANKADAPTER EFFLUENTouTLETs 4. CONTROL PANEL: QUANICS, INC. CUSTOM QUAD CONTROL PANEL (CUSTOM - NO PART NUMBER). o 0 0
<br /> 5. PUMP CHAMBER: FOUR (4) P-TE-50 % HP TURBINE PUMPS IN FILTERED PUMP VAULT. �J�, O Q
<br /> 6. MOUND SYSTEM: PROJECT MANAGER AND ENGINEER-OF-RECORD TO STAKE MOUND FOOTPRINT. NATIVE SOIL U o ~
<br /> SURFACE MUST BE SCARIFIED EAST-TO-WEST 8"-10" IN DEPTH, PREFERABLY WITH A CHISEL PLOW. m"®® N 3
<br /> �,� q�oN3 N
<br /> EFFLUENT DISCHARGES FLOAT TREE ENGINEER-OF-RECORD MUST BE ON-SITE FOR THIS PROCEDURE. Q o n a,
<br /> INFLUENT LINE FROM O O O 7. CONCRETE SAND FROM BROWN SAND, INC. OR EQUIVALENT MUST BE WASHED AND EXTREMELY CLEAN - �/ >~ o 0
<br /> DARBAR HALL (F) NEW 2000 GALLON NEW 2000 GALLON P&L APPROXIMATELY 1,025 CY. AGGREGATE FROM BROWN SAND, INC. OR EQUIVALENT MUST BE 1"-2.5" IN SIZE AND • C: o
<br /> P&L GREASE GREASE INTERCEPTOR TANK MUST ALSO BE WASHED AND EXTREMELY CLEAN - APPROXIMATELY 212 CY. SAND AND AGGREGATE SHALL BE
<br /> 44.00•,
<br /> INTERCEPTOR TANK 44°FILTERED EMPLACED BY CONVEYOR BELT SO AS TO NOT DISTURB PLOWED NATIVE SOIL BY HAUL TRUCKS. TOP SOIL o
<br /> PUMP VAULTFROM BROWN SAND, INC. OR EQUIVALENT, MUST BE LOAM CLASSIFICATION (USCS = ML) TO BE USED AS THE DESIGN ENGINEER: a'
<br /> INFLUENT LINE FROM O O O TURBINE PUMPS I
<br /> Ptioms: CAP OVER THE MOUND - APPROXIMATELY 571 CY. DON D. CHESNEY
<br /> umpop
<br /> WEST HOUSE (E) O O 10 gpm 8. CALCULATED VOLUMES OF THE THREE MATERIALS ABOVE ARE ESTIMATES. CONTRACTOR MUST CONSIDER
<br /> 20 gpm
<br /> 30 gpm ADJUSTMENTS IN HIS PROPOSAL TO COVER SHORTAGES OR OVERAGES OF SAND, AGGREGATE AND SOIL CAP LICENSE NO:
<br /> INFLUENT LINE FROM 50 gpm 1/16"FILTERING PANELS MATERIALS. VOLUMES CAN VARY SUBSTANTIALLY DUE TO SEVERAL VARIABLES. RCE 75479
<br /> DARBAR HALL KITCHENETTE (F) O O O Pump at vesqua avaics.n t 9. MOUND SYSTEM PIPING NETWORK: QUANICS, INC. PDS-MND 600. TOTAL OF FOUR (4) INDIVIDUAL MOUND SYSTEM
<br /> online at quanics.net
<br /> PIPING NETWORKS. ALL FOUR INDIVIDUAL PIPING NETWORKS MUST BE INSTALLED LEVEL ON TOP OF AGGREGATE. DRAFTED BY: CHECKED BY: o
<br /> 10. AFTER INSTALLING ORIFICE SHIELDS AND PLACEMENT OF AGGREGATE OVER LATERALS, INSTALL GEOTECHNICAL JMC DDC
<br /> SCALE IN FEET FABRIC OVER BOTH AGGREGATE AND SAND FILL TO MOUND PERIMETER. APPROXIMATELY 15,000 SF OF FABRIC
<br /> INFLUENT LINE FROM MATERIAL. SCALE: AS SHOWN
<br /> eaadcs contacts- Tedwical Aon Jed Draft11. AFTER MOUND CONSTRUCTION, SOIL CAP MATERIAL SHOULD BE CAREFULLY HYDRO-COMPACTED. NATIVE GRASS 0
<br /> LANGAR HALL KITCHEN (F) Stan Burdens,RS Eric SNeids Tan Je Mhs -
<br /> 502-992-04 502-992-Bras m-992-8216 DATE: 10-26-2012 v
<br /> B bardersEganlcsnet EsW6 wq Nc..t T*W% @wenn-eget SEED MAY BE PLANTED OVER SOIL CAP. r
<br /> INFLUENT LINE FROM INFLUENT LINE FROM o 10 20 4o Tam Pe PG Uja KevhShermw PE PMD "adK"so�Dkrca�dwA��tth»nta ,�` � � w� Q'�MN.414 Y
<br /> 615-28399 sot-Ts1-r2s8 HnA�racudBdemdtrdputents n T BT/ 12. INSTALL REBAR SAFETY CAPS AFTER J-BAR EMPLACEMENT IN FOOTING FOR BLOCK MASONRY AROUND JOB N0: 219012M1
<br /> LANGAR HALL F ASSEMBLY HALL E Tpettywq�net Kshernonegnrtic—t
<br /> ( ( ' p"'''B "'" w"` I "'w"bm PERIMETER. �
<br /> INFLUENT LINE FROM 13. INSTALL NEW 1,600 GALLON SEPTIC TANK FOR ON-SITE WEST HOUSE. INSTALL POLYLOK PL-68 FILTER ON DWG. N0:
<br /> EAST HOUSE (E) SCALE: NTS
<br /> OUTLET. SHEET
<br /> D "
<br /> 0
<br /> �F
<br /> PLAN VIEW STEP SYSTEM 1
<br /> N
<br /> 0
<br />
|