Laserfiche WebLink
Mountain House Specific Plan III — <br /> ........................................................................................................................................................................... <br /> 12.3 Potable Water Demand 12-4 <br /> 12.3.1 Master Plan Summary 12-4 <br /> 12.3.2 Specific Plan 111 Description 12-4 <br /> 12.3.3 Implementation Measures 12-5 <br /> 12.4 Water Conservation 12-8 <br /> 12.4.1 Master Plar Summary 12-8 _ <br /> 12.4.2 Specific Plan III Description 12-8 <br /> 12.4.3 Implementation Measures 12-8 <br /> 12.5 BBID Service to Interim Agricultural Operations 12-9 <br /> 12.5.1 Master Plar Summary 12-9 <br /> 12.5.2 Specific Plan III Description 12-9 <br /> 12.5.3 Implement2tion Measures 12-10 <br /> 12.6 Water Treatment Plant 12-11 <br /> 12.6.1 Master Plan Summary 12-11 <br /> 12.6.2 Specific Pkan III Description 12-11 <br /> 12.6.3 Implement2tion Measures 12-12 <br /> 12.7 Water Storage 12-12 <br /> 12.7.1 Master Plan Summary 12-12 <br /> 12.7.2 Specific Pkin III Description 12-12 <br /> 12.7.3 Implementation Measures 12-13 <br /> 12.8 Water Distribution System 12-13 <br /> 12.8.1 Master Plan Summary 12-13 <br /> 12.8.2 Specific Plan III Description 12-14 <br /> 12.8.3 Implementation Measures 12-14 <br /> 12.9 Siting Criteria '2-15 <br /> 12.9.1 Master Plan Summary 12-15 <br /> 12.9.2 Specific Plan 111 Description 12-15 <br /> 12.9.3 Implementation Measures 12-16 <br /> x Draft 03/14/05 <br /> .........................................................................................................................................................1................. <br />