Laserfiche WebLink
Mountain House Specific Plan III — <br /> ........................................................................................................................................................................... <br /> b. The backbone telecommunications facilities shall be constructed underground and follow the main — <br /> routes of the other service utilities. <br /> c. Residential Equipment: As a condition of Tentative Map approval, each residential unit shall have an _ <br /> appropriate"in unit"hook-up terminal. <br /> d. Communication systems of the latest technology shall be provided for use by the schools,parks and <br /> recreation and public infrastructure. <br /> e. As a condition of Tentative Map approval, each business shall have an appropriate"in unit"hook up <br /> terminals and equipment. <br /> f. When any portion of an arterial street is to be included in a development's construction plans,then all <br /> of the buried utilities that are ultimately planned to be within the improvement area shall be installed <br /> as part of the street improvement project,regardless if any of the utilities are needed for any phase of <br /> the development associated with street construction. Conduits or sleeves may be installed in lieu of _ <br /> buried utility,if approved by the MHCSD. <br /> g. Any phased development shall install all "in-tract"utilities needed to serve its development. In <br /> addition,if any future adjacent or nearby phases of the development,or adjacent neighborhoods,will <br /> depend on obtaining service from such utilities,then the utility lines shall be sized to serve these <br /> future developments. Any utility lines that are intended to be used by an adjacent development or <br /> neighborhood shall be installed up to the phase or Tentative Map boundary line to make it available <br /> for future extension. - <br /> h. All communications infrastructure facilities outside the boundary of the Tentative Maps shall be <br /> constructed,in accordance with the Master Plans,and fully operational,or bonded for,prior to the _ <br /> recording of the Final Map. The MHCSD General Manager may defer the installation of a facility if it <br /> can be demonstrated to the satisfaction of the MHCSD General Manager that it is not needed for the <br /> phase being developed. Any deferral will require the developer to provide the MHCSD a bond <br /> insuring the eventual construction of the facility. <br /> i. When public utilities are to be located outside public rights-of-way but within the Tentative Map <br /> boundary,the developer shall provide public utility easements for these utilities. The easements shall <br /> be shown on all Final Maps and parcel maps. <br /> 8-8 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />