My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> 9.3.2 Specific Plan III Description — <br /> The project is served regionally by 1-205 freeway, located just to the south of the project site. I-205 <br /> provides access to Tracy and to I-580 to the west,which connects with the greater San Francisco Bay <br /> Area. 1-205 has six lanes in the vicinity of the project. <br /> The Interstate 205/Mountain House Parkway interchange is currently configured with a two-lane overpass <br /> and single lane on and off ramps to the freeway. The MHCSD is preparing a Project Study Report(PSR) <br /> that proposes widening the existing two-lane overpass to six lanes to provide three northbound and three <br /> southbound lanes,constructing a southbound to eastbound loop on-ramp, and modifying the ramps to the <br /> existing intersections. It is expected that construction will begin in 2005, in time to serve development <br /> within Specific Plan III. <br /> 9.3.3 Implementation Measures <br /> a. MHCSD Community Funding and Participation Requirements. All implementing projects shall <br /> comply with the requirements of the MHCSD Mountain House Transportation Improvement Fee <br /> Ordinance and Technical Report Dated March 19,2000. — <br /> 9.4 Arterials - <br /> 9.4.1 Master Plan Summary <br /> The Master Plan requires Mountain House to adequately plan for and assign fair share responsibility to all <br /> County arterials that may be significantly impacted by the community. County arterials addressed by the <br /> Master Plan include all non-freeway roadways external to the community plus those arterials that carry — <br /> County and Mountain House traffic directly through the community. Specifically,in the SPIII area these <br /> include Central Parkway,De Anza Boulevard,Mountain House Parkway,and Grant Line Road. <br /> County roadways are intended to maintain LOS C during peak periods on all roads except for County <br /> road segments which function as Mountain House Gateways which may operate at LOS D. Mountain <br /> House Gateways include Grant Line Road from the County line to Mountain House Parkway; Mountain <br /> House Parkway from Grant Line Road to I-205; Byron Road from County Line to Wicklund Road. — <br /> Each Specific Plan and accompanying environmental review will assess the transportation impacts of — <br /> Mountain House development on other Counties and Cities. When the community is determined by the <br /> County to be the primary new traffic contributor,the community will be responsible for initiating traffic <br /> studies and improvements consistent with the Master Plan. Improvements will be subject to the <br /> provisions of the County's offset mitigation program and cost reimbursement program. <br /> 9-6 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.