Laserfiche WebLink
Mountain House Speorflc Plan III <br /> ........................................................................................................................................................I.................. <br /> BBID shall be required. Annexation to BBB) shall be required prior to the recordation of the Final — <br /> Map. <br /> b. Land use within the Specific Plan III area shall generally conform to the approved land use plan and _ <br /> the type and number of dwelling units and square footage of industrial or commercial uses tabulated <br /> for the plan. Deviations from the approved land use plan which are projected to increase water <br /> demand above MHMP levels shall not be permitted unless additional sources of water are secured. <br /> c. Water use shall be monitored continuously and adjustments to supply made as necessary as directed <br /> by the MHCSD. <br /> d. An agreement between BBID and Delta College for delivery of non-potable water for landscape <br /> irrigation purposes must be approved prior to the annexation of the college to MHCSD, or — <br /> f. The existing agreement between MHCSD and BBID must be amended to include the delivery of non- <br /> potable water for landscape irrigation purposes on the Delta Community College site and in the _ <br /> Community Park. <br /> 12.3 Potable Water Demand <br /> 12.3.1 Master Plan Summary — <br /> To provide a safe,reliable and sufficient water supply for the community,the Master Plan directs that <br /> development within Mountain House shall consume less water than in similar communities, and less than <br /> that assumed in current County standards. <br /> Specific Plan III will include a comparison of actual water demand for the community with the projected <br /> water demand used in the Master Plan. If water use specified in the Master Plan is exceeded,the Plan <br /> shall specify additional actions that would be implemented to reduce consumption to meet Master Plan <br /> requirements,with continued or additional water conservation measures. If further conservation measures <br /> do not appear to be possible,then the Master Plan will be revised, if necessary,prior to approval of <br /> Specific Plan III to reflect new projected water demand and revised infrastructure facilities to permit <br /> increased water usage. Further,the Plan will identify measures to be incorporated into the project to — <br /> ensure that the demand would not exceed the confirmed supply. <br /> 12.3.2 Specific Plan III Description <br /> Water demand for the Specific Plan III area was calculated using the water use factors recommended by — <br /> West Yost and Associates(WYA) in the August 2003 Potable Water System Master Plan Update. The <br /> water use factors determined by WYA are based on recent actual demands in the county and include less _ <br /> conservation than those used in the Mountain House Water System Master Plan(WSMP, September <br /> 2000). Generally, the WYA water use factors are higher for residential,commercial and industrial land <br /> 12-4 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />