Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> reflect new projected wastewater generation and revised infiastmcture facilities to permit increased wastewater <br /> generation and disposal. <br /> 13.2.2 Specific Plan III Description <br /> The Master Plan requires an evaluation of actual wastewater generation compared to Master Plan assumptions. — <br /> Table 13-1 presents the wastewater generation for the Specific Plan III area versus the wastewater generation <br /> (average dry weather flow,with 14%conservation)identified in the MIIMP.The proposed college will _ <br /> generate more wastewater than the single family home land use for the same area in the MHMP.The Delta <br /> College Center EIR utilized a wastewater generation rate of 12 gallons per capita per day(gpcd)(average dry <br /> weather flow,without conservation).For Specific Plan III,the wastewater generation rate for the college is <br /> being revised upward to 15 gpcd,per the direction of the MHCSD.Also,per the direction of the MHCSD,the <br /> total wastewater generation by the land uses within Specific Plan III cannot exceed the Master Plan.Therefore, -" <br /> the amount of wastewater generation allocated to the college is greater than the Master Plan,and wastewater <br /> generation from other properties within Specific Plan III have been correspondingly reduced.The existing — <br /> sewer infrastructure downstream is therefore unaffected by the addition of the college land use. <br /> 13.2.3 Implementation Measures <br /> a MHCSD Generation,Design and Monitoring Requirements: All implementing projects shall comply with <br /> the MHCSD Development Standards. <br /> 13.3 Wastewater Collection System <br /> 13.3.1 Master Plan Summary <br /> The Master Plan limits the area to be served by the wastewater trunk collection system to the limits of the <br /> Mountain House sphere of influence.The system is intended to transport wastewater from all areas within the <br /> community to the treatment plant and avoid any adverse impacts on public health and safety.Wastewater shall <br /> be conveyed to the treatment plant through a pipe network system in a fast and efficient manner.The <br /> collection facilities will be designed and constructed in such a manner that the health and safety of inhabitants <br /> of the community are not adversely affected. <br /> 13.3.2 Specific Plan III Description <br /> A trunk pipeline system must be installed to adequately serve Specific Plan III.There are no additional <br /> facilities needed to serve future developments,as Specific Plan III is at the`upstream"extremity of the <br /> Mountain House Community. In no case will Specific Plan III development be forced to install trunk line - <br /> extensions through completed Mountain House neighborhoods in order to secure service. <br /> 13-2 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />