My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> reflect new projected wastewater generation and revised infiastmcture facilities to permit increased wastewater <br /> generation and disposal. <br /> 13.2.2 Specific Plan III Description <br /> The Master Plan requires an evaluation of actual wastewater generation compared to Master Plan assumptions. — <br /> Table 13-1 presents the wastewater generation for the Specific Plan III area versus the wastewater generation <br /> (average dry weather flow,with 14%conservation)identified in the MIIMP.The proposed college will _ <br /> generate more wastewater than the single family home land use for the same area in the MHMP.The Delta <br /> College Center EIR utilized a wastewater generation rate of 12 gallons per capita per day(gpcd)(average dry <br /> weather flow,without conservation).For Specific Plan III,the wastewater generation rate for the college is <br /> being revised upward to 15 gpcd,per the direction of the MHCSD.Also,per the direction of the MHCSD,the <br /> total wastewater generation by the land uses within Specific Plan III cannot exceed the Master Plan.Therefore, -" <br /> the amount of wastewater generation allocated to the college is greater than the Master Plan,and wastewater <br /> generation from other properties within Specific Plan III have been correspondingly reduced.The existing — <br /> sewer infrastructure downstream is therefore unaffected by the addition of the college land use. <br /> 13.2.3 Implementation Measures <br /> a MHCSD Generation,Design and Monitoring Requirements: All implementing projects shall comply with <br /> the MHCSD Development Standards. <br /> 13.3 Wastewater Collection System <br /> 13.3.1 Master Plan Summary <br /> The Master Plan limits the area to be served by the wastewater trunk collection system to the limits of the <br /> Mountain House sphere of influence.The system is intended to transport wastewater from all areas within the <br /> community to the treatment plant and avoid any adverse impacts on public health and safety.Wastewater shall <br /> be conveyed to the treatment plant through a pipe network system in a fast and efficient manner.The <br /> collection facilities will be designed and constructed in such a manner that the health and safety of inhabitants <br /> of the community are not adversely affected. <br /> 13.3.2 Specific Plan III Description <br /> A trunk pipeline system must be installed to adequately serve Specific Plan III.There are no additional <br /> facilities needed to serve future developments,as Specific Plan III is at the`upstream"extremity of the <br /> Mountain House Community. In no case will Specific Plan III development be forced to install trunk line - <br /> extensions through completed Mountain House neighborhoods in order to secure service. <br /> 13-2 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.