Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> Y <br /> (CEQ,including the GEC's requirements of the EAEC to construct conveyance pipelines and pumping <br /> facilities to connect the facility with the Mountain House Waste Water Treatment Plant,and the EAEC's <br /> requirement to convey and utilize Mountain House treated effluent for the EAEC's cooling and non-potable <br /> uses. This provision was specifically analyzed as part of the CEC's environmental review and approval <br /> v process. In addition to the land and Old River Discharges allowed under existing CVRWQCB Discharge <br /> Permits,treated effluent from the Mountain House Waste Water Treatment Plant may be discharged to the <br /> ` EAEC facility as allowed for under the CEC's permit. Specific discharge options will be determined by the <br /> MHCSD during the phasing and implementation of Specific Plan III. <br /> 13.4.3 Implementation Measures <br /> a. In order to be able to serve the additional development of Specific Plan III and Specific Plan II,a second <br /> W WTP expansion will be needed.Therefore,the engineering design process for the second expansion is <br /> now underway,and it is expected that the second expansion construction effort will begin soon after the <br /> ` first expansion construction is completed. It is planned that by early 2007,the W WTP will have the <br /> capacity to treat 5.4 MGD of wastewater. <br /> k. b. The waste water treatment plant shall be constructed and deemed operational,with sufficient capacity to <br /> meet the projected demands for Specific Plan III,prior to the issuance of any building permits for the <br /> construction of buildings within Specific Plan Ill. <br /> c. All applicable implementing projects shall comply with the existing San Joaquin County Use Permit for <br /> the Waste Water Treatment Plant. <br /> d. Subject to the terms of the Master Plan Development Agreement between San Joaquin County and <br /> Trimark Communities,LLC,and the Master Acquisition and Reimbursement Agreement between the <br /> MHCSD and Trimark Communities,LLC,treated effluent may be discharged through a variety of <br /> options,including,but not limited to one or a combination of the following: <br /> e. The total treated wastewater generated by Specific Plan III may be discharged year-round into Old River, <br /> subject to the adopted standards of CVRWQCB Order 98-192 as amended <br /> f. Land reclamation,consistent with standards established by and subject to environmental clearance and <br /> obtaining the requisite permits from the CVRWQCB and MHCSD,may be used to dispose of treated <br /> effluent from Specific Plan III on the Pombo or other off-site properties. <br /> g. The total treated waste water generated by the entire community may be discharged to users outside the <br /> limits of the MHCSD as may be allowed by separate permit and environmental analysis,including the <br /> discharge and conveyance to the East Altamont Energy Facility in Alameda County. <br /> h. MHCSD Design and Construction Requirements: All implementing public improvement projects shall <br /> �- comply with the applicable provisions of the MHCSD Development Standards. <br /> Draft 03%4/05 13-7 <br /> ........................................................................................................................................................................... <br />