Laserfiche WebLink
Mountain House Spedrfic Plan III - <br /> ........................................................................................................................................................................... <br /> 15.2.3 Implementation Measures <br /> b. Each segment of the storm drainage system shall be designed as needed to provide protection for each <br /> phase of development. <br /> c. The MHCSD shall coordinate with the agencies having jurisdiction over Mountain House off-site <br /> watersheds areas to ensure that any future development projects do not alter the existing volume, <br /> velocity and quality of storm water runoff discharged downstream to the Mountain House Project. <br /> d. All implementing projects shall comply with the applicable provisions of the MHCSD Storm Water — <br /> Master Plan Update and addenda and the Development Standards. <br /> 15.3 Primary Storm Drain Collection System <br /> 15.3.1 Master Plan Summary <br /> The primary storm drainage system at Mountain House provides for the conveyance of all off-site and on- <br /> site precipitation,plus any urban runoff,to the Old River as a terminal drain. The primary storm drain <br /> collection system includes trunk storm drain lines, secondary storm drain lines, major open-channels <br /> (Mountain House Creek) and water quality basins. <br /> The Master Plan requires that on-site and off-site drainage generated by precipitation and urban run-off be <br /> jointly considered and conveyed safely through the community. On-site drainage shall not impact — <br /> property owners adjacent or within the community, or downstream property owners. Discharge of <br /> sediments to creeks,ditches and Old River shall be minimized. _ <br /> Trunk line pipes, the water quality basin, and major open-channels within Neighborhood A shall he <br /> designed and constructed to transport the 100-year volumetric flow rate. Trunk pipe lines within <br /> Neighborhoods B and D shall be designed to transport the 10-year runoff flows, with the 100-year storm <br /> runoff to be conveyed within the street right-of-way(DeAnza Boulevard). Trunk line pipes shall be <br /> designed for gravity flow conditions. <br /> Should temporary open channels be required for construction phasing, erosion shall be minimized by <br /> designing and constructing open-channels to convey storm water runoff at or below the allowable _ <br /> maximum velocity,and by using appropriate streambed protection and/or energy dissipaters at transitions <br /> from supercritical to sub critical flow,at the confluence of channels,at the downstream location of <br /> culverts,and at channel transitions. Streambed protection shall include appropriate species of plants. <br /> The ultimate point of terminal discharge for all drainage shall be Old River. Terminal discharge will _ <br /> occur by gravity flow. <br /> 15-4 Draft 03114/05 <br /> ........................................................................................................................................................................... <br />