Laserfiche WebLink
Mountain House Specific Plan III — <br /> ........................................................................................................................................................................... <br /> 15.4 Secondary Storm Drain Collection System - <br /> 15.4.1 Master Plan Summary <br /> The Master Plan requires that on-site drainage occurring over the community be safely conveyed by the <br /> secondary storm drain collection system to the primary storm drain collection system. The secondary <br /> storm drain collection system shall be used to collect and convey on-site drainage to the primary storm — <br /> system safely with adequate flood protection. The design and construction of the secondary storm drain <br /> collection system shall be based on the 10-year storm event. <br /> 15.4.2 Specific Plan III Description <br /> The secondary storm drain collection system is primarily located within the local and collector streets and <br /> consists of local private property BUT site collection and conveyance facilities, localized drainage _ <br /> swales, street gutters, field inlets, catch basins,catch basin laterals and underground pipes. These facilities <br /> transport on-site drainage to trunk lines or to water quality basins. The secondary storm drain collection <br /> system will be designed and constructed per the requirements of the MHCSD. <br /> 15.4.3 Implementation Measures <br /> a. All storm drain improvement projects shall comply with the MHCSD Development Standards. <br /> 15.5 Mountain House Creek Improvements <br /> 15.5.1 Master Plan Summary — <br /> The Master Plan requires that Mountain House Creek be developed as a multi-use corridor for <br /> conveyance of off-site and on-site drainage through the community and for a wildlife habitat and <br /> recreation corridor(see Chapter Seven for recreational and park requirements).Mountain House Creek <br /> shall be used as an open channel to convey off-site and on-site drainage through the community with — <br /> adequate flood protection. The creek shall discharge into Old River,but the deposition of sediment into <br /> the river shall be minimized by causing sediment deposition to occur in the Mountain House Creek _ <br /> channel.Mountain House Creek shall be designed to minimize erosion. <br /> 15.5.2 Specific Plan III Description <br /> Mountain House Creek, constructed as part of Specific Plan I,was designed and constructed according to _ <br /> the design criteria contained within the Community Approvals,as well as a Nationwide 27 Permit issued <br /> by the United States Army Corps of Engineers under the Federal Clean Water Act. These improvements <br /> were sized to convey the 100 year storm event. <br /> 15-6 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />