Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> ` All public infrastructure necessary for development of Specific Plan III will be provided from the <br /> resources of the project. Some facilities,such as roads,parks,and utility transmission facilities,will be <br /> constructed with funds internal to the project. The required funds will come from a number of potential <br /> sources,including infrastructure bonds,private capital, funding obtained through rates and fees, fee <br /> credits and grants and tax credits. Once the infrastructure and development plans are finalized, a <br /> financing plan will be prepared that will detail the sources and uses of funds for the specified capital <br /> improvements and amenities. The financing plan will also match the availability of funding to project <br /> needs over time through a phasing plan. <br /> Other public facilities that are not located within Specific Plan III but have been constructed in part to <br /> serve Specific Plan III, such as the water and wastewater treatment plants and associated pipes and <br /> facilities,will he constructed in part with funds from Specific Plan III through payments to the MHCSD. <br /> Details of the costs of infrastructure and public facilities necessary for Specific Plan III are presented in <br /> Ir Table 16-2. These costs are currently estimated to total$115.4 million. The costs include: <br /> • Roads <br /> ` • Community Parks <br /> • Regional Park <br /> • Open Space Corridors <br /> ` • Utility Transmission Facilities,such as water,wastewater and storm water lines <br /> ` The majority of public infrastructure improvements will be financed through private financing obtained <br /> by developers and landowners at Specific Plan III and assessment bonds or other public finance secured <br /> by property tax revenue. Some facilities, such as utility infrastructure,will be constructed with funds <br /> from the utility provider,which in turn are financed through connection charges, development fees and <br /> rates charged to end users. Some capital facilities have also been constructed by the MHCSD. Table 16- <br /> ` 3 summarizes the sources of funds anticipated for the capital improvements detailed in the Specific Plan, <br /> which total$115.4 million. The bulk of the funding,approximately$54.0 million,will come from private <br /> financing. An additional significant source of funding will be fees collected for traffic mitigation and <br /> infrastructure constructed elsewhere at Mountain House,as shown on Table 16-3. As the financing plan is <br /> ` developed and the details of public financing mechanisms finalized, an additional analysis will be <br /> conducted to ensure that the total fees,assessments and taxes on the project do not render the project <br /> economically infeasible. <br /> Draft 03/14/05 16-5 <br /> ........................................................................................................................................................................... <br />