My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> ` All public infrastructure necessary for development of Specific Plan III will be provided from the <br /> resources of the project. Some facilities,such as roads,parks,and utility transmission facilities,will be <br /> constructed with funds internal to the project. The required funds will come from a number of potential <br /> sources,including infrastructure bonds,private capital, funding obtained through rates and fees, fee <br /> credits and grants and tax credits. Once the infrastructure and development plans are finalized, a <br /> financing plan will be prepared that will detail the sources and uses of funds for the specified capital <br /> improvements and amenities. The financing plan will also match the availability of funding to project <br /> needs over time through a phasing plan. <br /> Other public facilities that are not located within Specific Plan III but have been constructed in part to <br /> serve Specific Plan III, such as the water and wastewater treatment plants and associated pipes and <br /> facilities,will he constructed in part with funds from Specific Plan III through payments to the MHCSD. <br /> Details of the costs of infrastructure and public facilities necessary for Specific Plan III are presented in <br /> Ir Table 16-2. These costs are currently estimated to total$115.4 million. The costs include: <br /> • Roads <br /> ` • Community Parks <br /> • Regional Park <br /> • Open Space Corridors <br /> ` • Utility Transmission Facilities,such as water,wastewater and storm water lines <br /> ` The majority of public infrastructure improvements will be financed through private financing obtained <br /> by developers and landowners at Specific Plan III and assessment bonds or other public finance secured <br /> by property tax revenue. Some facilities, such as utility infrastructure,will be constructed with funds <br /> from the utility provider,which in turn are financed through connection charges, development fees and <br /> rates charged to end users. Some capital facilities have also been constructed by the MHCSD. Table 16- <br /> ` 3 summarizes the sources of funds anticipated for the capital improvements detailed in the Specific Plan, <br /> which total$115.4 million. The bulk of the funding,approximately$54.0 million,will come from private <br /> financing. An additional significant source of funding will be fees collected for traffic mitigation and <br /> infrastructure constructed elsewhere at Mountain House,as shown on Table 16-3. As the financing plan is <br /> ` developed and the details of public financing mechanisms finalized, an additional analysis will be <br /> conducted to ensure that the total fees,assessments and taxes on the project do not render the project <br /> economically infeasible. <br /> Draft 03/14/05 16-5 <br /> ........................................................................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.