Laserfiche WebLink
cn <br /> Table 2-1 <br /> Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> Impact Significance Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> ¢ c <br /> d 4.2 Land Use <br /> S' <br /> 0 4.2.1.Land Use and Agriculture—Conflict with Existing Land PS 4.2-1.Land Use and Agriculture—Conflict with Existing Land LTS <br /> Uses.The proposed land uses would be compatible with the Uses. <br /> (n existing on-site and adjacent land uses with the exceptions of the The College Park developers shall implement the following <br /> BBID irrigation canals and pipelines that cross the site.A potentially measures: <br /> significant impact would occur. . Fence off the two on-site BBID canals from proposed urban <br /> d development until such time as the canals are filled.The fencing <br /> shall be sufficient to block access to the canals by all except <br /> o BBID personnel and other authorized persons,and shall be <br /> developed in coordination with BBID to ensure that BBID has <br /> rn continued access to the canals for maintenance activities. <br /> . Implement Mitigation Measure 4.9-5,identified in Section 4.9, <br /> "Public Health and Safety,"to ensure that the proposed <br /> residences are not exposed to an explosion hazard from the <br /> natural gas pipelines within the PG&E—Chevron easement that <br /> bisects the project site. <br /> . Identify an agricultural buffer of no less than 100 feet at the time <br /> of Tentative Map approval for any new units in the residential <br /> area in and south of Grant Line Village and adjacent to the <br /> County line. <br /> 4.2-2.Land Use and Agriculture—Conflict between Proposed S 4.2.2.Land Use and Agriculture—Conflicts between Proposed LTS <br /> Land Uses.The proposed project would not generate conflicts Land Uses. <br /> between proposed land uses,except for the proposed lighted Implement Mitigation Measure 4.14.3. <br /> community park facilities that would generate conflicts with <br /> proposed adjacent residential uses.A significant impact would <br /> occur. <br /> 4.2-3.Land Use and Agriculture—Direct Conversion of Su 4.2-3.Land Use and Agriculture—Conversion of Important Su <br /> Important Farland.The proposed project would result in the Farmland. <br /> direct conversion of approximately 760 acres(730 on the College No feasible mitigation measures are available to avoid the <br /> Park project site and 30 acres on the Pombo property)of Important conversion of farmland. <br /> Farmland(Prime Farmland and Farmland of Local Importance)to <br /> w <br /> urban land uses.A significant and unavoidable impact would occur. <br /> 3 m <br />