Laserfiche WebLink
t f r r r r I i r r I r r I I v I I I <br /> Cn <br /> w <br /> ` Table 2-1 (continued) <br /> Summary of Impacts and Mitigation Measures(Applicable to Program and Project-Specific Impacts) <br /> Significance Significance <br /> d Impact before Mitigation Mitigation Measure <br /> after Mitigation <br /> d. season. A setback of 100 feet from white-tailed kite nesting <br /> areas shall be established and maintained during the nesting <br /> g season for the period encompassing nest building and <br /> m continuing until fledglings leave nests. This setback applies <br /> whenever construction or other ground-disturbing activities <br /> T. must begin during the nesting season in the presence of nests <br /> that are known to be occupied. Setbacks shall be marked by <br /> brightly colored temporary fencing. <br /> ► Northern Harrier. If project construction begins during the <br /> o nesting season(February 15—August 31),pre-construction <br /> Ln surveys shall be conducted during the nesting season in <br /> D suitable nesting habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within the 2 weeks <br /> before construction begins. A setback of 500 feet from northern <br /> N harrier nesting areas shall be established and maintained <br /> during the nesting season for the period encompassing nest <br /> building and continuing until fledglings leave nests. This <br /> setback applies whenever construction or other ground- <br /> disturbing activities must begin during the nesting season in the <br /> presence of nests that are known to be occupied. Setbacks <br /> shall be marked by brightly colored temporary fencing. <br /> ► Common Raptors. If project construction begins during the <br /> nesting season(February 15—August 31),pre-construction <br /> surveys shall be conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within the 2 weeks <br /> before construction or tree removal begins. If any active nests <br /> are found,a setback of 200 feet from each nest shall be <br /> established and maintained during the nesting season for the <br /> period encompassing nest building and continuing until <br /> fledglings leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities must begin <br /> during the nesting season in the presence of nests that are <br /> known to be occupied. Setbacks shall be marked by brightly <br /> 3 m colored temporary fencing. <br /> 0 <br />