Laserfiche WebLink
I 1 f I t [ I 1 1 I 1 1 r 1 1 I 1 I I <br /> Cn <br /> Table 2-1 (continued) <br /> m�, Summary of Impacts and Mitigation Measures(Applicable to Program and Project-Specific Impacts) <br /> Significance w Impact Si g Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> With this standard,the projected cumulative traffic effect on this <br /> roadway would be less than significant. <br /> 0 <br /> According to the MHMP EIR,"As an alternative to widening the 1-205 <br /> freeway beyond six lanes,the project sponsor shall contribute a fair <br /> share to the development of a parallel east-west roadway system <br /> north of I-205,extending between Mountain House and the City of <br /> Lathrop's Gold Rush City development,including the necessary <br /> multi-jurisdictional altemative/feasibility studies."Recent news <br /> o reports indicate that the River Island project in Lathrop will be <br /> funding a portion of the proposed Golden Valley Parkway north of <br /> Ln the heavily congested 1-205.A preliminary alignment of this roadway <br /> 70 is shown in the draft City of Tracy General Plan.The County should <br /> work with the City of Tracy in the future to conduct more detailed <br /> analysis of the area,possibly conducting a plan line study for the <br /> N roadway.Such an effort could also result in reduced cumulative <br /> N traffic effects on the existing roadways. <br /> There is no additional mitigation available to reduce the 2025 <br /> cumulative traffic impact on Altamont Pass Road west of Grant Line <br /> Road and on 1-580, 1-205,and 1-5 north of 1-205 to a less-than- <br /> significant level. <br /> 4.11.2.Transportation—Potential Traffic Safety Issues during LTS No mitigation required. LTS <br /> Construction.Project construction would be required to comply <br /> with the Mountain House Construction Management Plan,which <br /> would preclude roadway less-than-significant impact damage and <br /> safety problems from occurring.A would occur. <br /> 4.12.Air Quality <br /> 4.12.1.Air Quality—Potential Generation of Temporary,Short- S Air Quality--Generation of Temporary,Short-Term Construction LTS <br /> Term Construction Emissions of Criteria Air Pollutants. Emissions of Criteria Air Pollutants.The College Park developers <br /> Construction activity under the proposed project would generate shall implement the latest version of the SJVAPCD construction- <br /> temporary emissions of criteria pollutants that could interfere with emissions control measures during construction(see"Regulatory <br /> the attainment of ambient air quality standards,and would generate Setting,"above). <br /> Cn fugitive dust that could adversely affect adjacent agricultural crops. The latest version of the SJVAPCD control measures are included in <br /> 3 mo Although the MHMP requires compliance with SJVAPCD control the Guide for Assessing and Mifigating Air Quality Impacts(SJVAPCD <br />