Laserfiche WebLink
3.3 PROPERTY OWNERSHIP <br /> The College Park project site is made up of approximately 65 separate parcels with 53 separate property owners <br /> (Figure 3-5).The majority of these parcels are located in Grant Line Village(a 54-acre residential neighborhood <br /> containing 50 residences).The largest controlling interest is GNK, LLC,which owns approximately 471 acres. <br /> Other major controlling interests include SJDCCD with 114 acres, InvestWest Matthews Land,Inc. with 52 acres, <br /> and Pegasus Development with 47.73 acres(includes the Hernandez property). Two of these property interests, <br /> GNK,LLC and InvestWest Matthews Land, Inc., are project applicants along with San Joaquin County in that <br /> they are seeking approval of Tentative Maps for their properties as part of the proposed project. In addition, <br /> SJDCCD is a project applicant, in that it is seeking an amendment to the MHMP to permit development of a <br /> community college on 114 acres in the southwest part of the College Park site.The balance of the property <br /> owners are not seeking Tentative Maps or other development approvals, and development of these parcels will <br /> require separate CEQA review if or when development proposals are made for those parcels. <br /> 3.4 EXISTING LAND USES <br /> The College Park project site includes a mixture of existing single-family residential, agricultural, and <br /> ► infrastructure uses(Figure 4.2-1). A large portion of the project site is in agricultural production of alfalfa, sugar <br /> beets, and com crops.There are two dairies on the project site,one on either side of Grant Line Road along <br /> Mountain House Parkway. The project site includes approximately 56 residences(50 in Grant Line Village, four <br /> in the central part of the site,one at one of the dairies,and one along the south side of Grant Line Road, <br /> approximately half way between Mountain House Parkway and the Alameda County line). Grant Line Village is a <br /> 54-acre residential neighborhood containing 50 existing residences. Two Byron-Bethany Irrigation District <br /> (BBID)irrigation canals, a 50-foot-wide Pacific Gas and Electric Company(PG&E)and Chevron easement <br /> containing two large high-pressure natural gas pipelines and a crude oil pipeline, and a 75-foot-wide PG&E <br /> electrical easement containing 230 kV(kilovolt) overhead electric transmission lines,bisect the site(Figure 3-5). <br /> 3.5 SURROUNDING LAND USES <br /> Most surrounding lands are either fallow or under agricultural production for alfalfa, sugar beets, corn, and <br /> irrigated and non-irrigated pasture. Seven residences are located directly north of the project site along the north <br /> side of Grant Line Road,and four residences are located directly east of the project site along the east side of <br /> Mountain House Parkway. The Delta-Mendota Canal forms a portion of the site's southwestem boundary and <br /> .- I-205 marks the site's southern boundary.Neighborhoods E,F, and G of Specific Plan I are located north of the <br /> project site, approximately 3,400 feet north of Grant Line Road.Neighborhoods E and F are currently under <br /> construction, and construction in Neighborhood G will begin soon. A commercial center is planned by Pegasus <br /> Development on a parcel located at the northeast comer of the I-205-Mountain House Parkway intersection on <br /> land covered under Specific Plan I.Between this off-site Pegasus parcel and the Delta College portion of the <br /> College Park site is an approximately 50-acre area of Specific Plan I to be added to College Park under the <br /> proposed project(Figure 3-5). This 50-acre area currently contains agricultural fields and is part of the 471 acres <br /> of the project site under the controlling interest of GNK, LLC. <br /> 3.6 PROJECT OBJECTIVES <br /> The following are the overall goals established by the MHMP for the Mountain House community and are <br /> applicable to the College Park project: <br /> ► Create a high-quality environment where people of all economic levels can live and work; <br /> ► Develop a distinct and unique new community that is separate from existing communities; <br /> y College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 3-5 Project Description <br />