Laserfiche WebLink
I Spray disposal area Discharge to river is <br /> for treated effluent \0%, based upon meeting <br /> (Trimark only) until 40er effluent standards. The <br /> ' \\ river discharge . current Discharge Permit <br /> approval is obtained `\limit is 5.4 mgd <br /> Expand STP capacity <br /> B" SS to serve SPQI (Plant <br /> j �' �\ location & lines shown <br /> are schematic) <br /> 1t� G4 Spray disposal of treated <br /> effluent to Pombo property <br /> until river discharge approval <br /> oT OLVD -- o is obtained (GNK properties <br /> only. Other SPIE properties <br /> s/eregd ' z to secure other disposal <br /> 11om I u ! sites or purchase capacity <br /> a Trimark r ��5 o <br /> rr��1 Sewer,P�,1A „ from GNK). <br /> vixwAiu �. Shed <br /> GR saay eBASEr4 _,, -. Reference: Irrigation Feasibility <br /> NE Bolen <br /> m . Study for the Pombo Property <br /> by PACE dated Jan. 13, 2004 <br /> � d <br /> Note: Major sewer mains <br /> shown only. Site specific <br /> ' YATAFcef sanitary sewer improvements <br /> L TA W1 required within each phase <br /> ' AATM E <br /> x i are not shown. <br /> sewer <br /> shed <br /> 6ady <br /> LEGEND: <br /> PROPOSED SANITARY SEWER (SIZES PROPOSED EFFLUENT DISPOSAL LINE <br /> _ PER COLLECTION SYSTEM STUDY) LIMITS OF SPIII <br /> — — — — — EXISTING SANITARY SEWER <br /> NOTE: ASSUMES SEWER IN CENTRAL & DEANZA IS COMPLETE TO SOUTH OF MASCOT BLVD. (BY OTHERS). <br /> Source: MacKay&Somps 10/04 <br /> Proposed Wastewater System Improvements FIGuaE 3-14 <br /> College Park at Mountain House o 1500 s000 , <br /> Speck Plan III Draft EIR EC <br /> PM125.1102A05 FEET NORTH <br />