My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.11 PROJECT GRADING <br /> Grading would be approximately balanced on-site,and would include the moving of approximately 700,000 cubic <br /> yards of cut and approximately 700,000 cubic yards of fill. <br /> 3.11.1 PROPOSED GRADING NEIGHBORHOODS AIB <br /> Most of Neighborhoods A/B was or is currently in agricultural,dairy or open space uses.The land area is <br /> predominately flat at approximately I%cross-grade and is generally suitable for development in its current grade <br /> conditions, with only finish grading required.Grading and drainage patterns are generally from southwest to <br /> northeast,and infrastructure systems have been designed accordingly.However, several land forms on the <br /> property may require greater than fine grading.The Delta College site is generally located within a depressed area <br /> created by Caltrans in the 1960s,which used the site as a borrow pit for construction of I-205 and I-580. This <br /> feature is made more pronounced by an existing ridge condition directly north of the college site that may require <br /> substantial grading to allow circulation access and pad development. It is anticipated that this knoll area <br /> development will be at a 20 to 30 foot higher elevation than the adjacent college and residential parcels to the <br /> south and east. A conceptual grading plan has been developed in the College Park at Mountain House Specific <br /> Plan III to allow for development in this area with potential infrastructure and circulation access.Other less <br /> substantial grading requirements include the filling and removal of the existing irrigation ditch network through <br /> the site,while still maintaining off-site connections, and the removal of berms along Grant Line Road, <br /> predominately at the northwest corner of the existing residential neighborhood.It is the intent of the applicants to <br /> provide balanced cut-and-fill grading for all areas of Neighborhoods A/B. <br /> 3.11.2 PROPOSED GRADING IN NEIGHBORHOOD D <br /> The College Park portion of Neighborhood D has no significant grading issues.The area consists of pasture and <br /> fallow and productive agriculture lands with an average cross-slope of I%to 2%draining from southeast to <br /> northwest and requiring only fine grading. <br /> 3.12 PROJECT PHASING <br /> As shown in Figure 3-17,the College Park project would be developed in four phases(Phases I through IV)over <br /> 20 years,with construction commencing in 2005 and ending in 2025.Phase I,from 2005 to 2008,would include <br /> residential, school, and neighborhood park development on the GNK,LLC parcel, and residential development on <br /> the InvestWest Matthews Land,Inc. and Pegasus parcels.Phase II,from 2008 to 2012,would include residential <br /> development on the Hernandez,Mendoza,and Buck parcels, and school and community park development on the <br /> GNK,LLC parcel.Phase III, from 2012 to 2015,would include commercial, office,and industrial development <br /> on the GNK,LLC parcel. Phase IV, from 2015 to 2025,would include residential development in Grant Line <br /> Village,if any.Development of Delta College would occur during all four phases.Table 3-5 provides more <br /> precise phasing information for the college. <br /> The utility and roadway infrastructure described earlier in this chapter would be developed,as needed,to serve <br /> each phase of the College Park project.Project phasing is shown in Figure 3-17.Utility phasing is shown in <br /> Figures 3-12 through 3-14. <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 3-43 Project Description <br />
The URL can be used to link to this page
Your browser does not support the video tag.