Laserfiche WebLink
and crude oil pipelines. See Section 4.9,"Public Health and Safety,"for further analysis of the hazards associated <br /> with the existing on-site electrical lines and natural gas—crude oil pipelines. <br /> The College Park project would include urban development within and along the two BBID irrigation canals that <br /> bisect the project site. Although these canals would eventually be filled under the proposed project and thus not <br /> represent a potential public safety hazard,they could represent a potential hazard in the interim.A potentially <br /> significant impact could occur. <br /> The proposed project would result in development of new residential uses in close proximity to the two existing <br /> dairies. Low-and medium-density residential uses would be developed directly west and across DeAnza <br /> Boulevard from the two dairies(Figure 3-613)and the dairies would not be replaced with limited industrial <br /> development until the last phases of the project(Figure 3-17). Therefore,the proposed residential uses in <br /> proximity to the dairies would be exposed to odors and noise from the dairies on a temporary basis until the <br /> dairies are removed. However,as indicated in the air quality and noise analyses contained in Sections 4.12,"Air <br /> Quality,"and 4.13,"Noise,"of this EIR,the dairies would eventually be phased out,thus making any impacts <br /> temporary and less than significant. <br /> As indicated in Figure 3-613,light industrial and office commercial uses would be developed along Mountain <br /> ` House Parkway,across the street from several existing residences located along the east side of Mountain House <br /> Parkway. The MHMP sets forth setback and buffer requirements along the"eastern edge"of the project.Policies <br /> 4.3.3(a)and(b)require a 32-foot landscaped setback along the west side of Mountain House Parkway planted <br /> with large evergreen screening shrubs,and the planting of trees along both sides and down the center median of <br /> Mountain House Parkway.These requirements would provide an effective buffer between the proposed land uses <br /> and the existing residences on the east side of Mountain House Parkway. A less-than-significant impact would <br /> occur. <br /> Mitigation Measure 4.2-1: Land Use and Agriculture—Conflict with Existing Land Uses <br /> The College Park developers shall implement the following measures: <br /> ► Fence off the two on-site BBID canals from proposed urban development until such time as the canals are <br /> filled.The fencing shall be sufficient to block access to the canals by all except BBID personnel and other <br /> authorized persons,and shall be developed in coordination with BBID to ensure that BBID has continued <br /> access to the canals for maintenance activities. <br /> Implement Mitigation Measure 4.9-5,identified in Section 4.9,"Public Health and Safety,"to ensure that the <br /> proposed residences are not exposed to an explosion hazard from the natural gas pipelines within the PG&E— <br /> Chevron easement that bisects the project site. <br /> ► Identify an agricultural buffer of no less than 100 feet at the time of Tentative Map approval for any new units <br /> in the residential area in and south of Grant Line Village and adjacent to the County line. <br /> Implementation of the above mitigation measures would reduce the potential interim conflicts between proposed <br /> uses and existing BBID canals to a less-than-significant level. <br /> IMPACT Land Use and Agriculture—Conflict between Proposed Land Uses. The proposed project would not <br /> 4.2-2 generate conflicts between proposed land uses, except for the proposed lighted community park facilities <br /> that would generate conflicts with proposed adjacent residential uses.A significant impact would occur. <br /> As indicated in Figure 3-6B in Chapter 3,the College Park project would include the development of a mix of <br /> residential,limited industrial,office commercial,neighborhood commercial,school,community college,parks, <br /> and public facility uses.Residential,neighborhood commercial, school,and park uses are generally uses that are <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.2-15 Land Use and Agriculture <br />