Laserfiche WebLink
Neighborhood J).However,even if groundwater associated with the required expansion of the basin under the <br /> r College Park project were encountered at WQBI,compliance with MHMP EIR Mitigation Measure 4.7-4 would <br /> avoid any potential for flooding associated with any required dewatering.MHMP EIR Mitigation Measure 4.74 <br /> requires that a preliminary soils report be prepared for each subdivision that identifies the seasonal high <br /> groundwater level at the location of any proposed detention/retention basins, implementation of any design <br /> recommendations made in the report required to avoid saturation or partial filling of the basins by groundwater, <br /> and routing and disposal of any drain discharges in such a way as to avoid flooding or saturation hazards. <br /> Although WQBI is not technically considered a subdivision,the lead agency indicated that Mitigation Measure <br /> 4.7A from the MHMP EIR would apply and is incorporated into this EIR below.Therefore, a less-than- <br /> significant impact would occur. <br /> .. Mitigation Measure 4.7-3: Drainage—Require Dewatering that Could Lead to Flooding. <br /> No mitigation is required. <br /> 4.7.5 RESIDUAL SIGNIFICANT IMPACTS <br /> The proposed project would not result in any significant residual drainage impacts with implementation of the <br /> mitigation measures recommended in this section. <br /> r <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.7-17 Drainage <br />