Laserfiche WebLink
• Within one-quarter-mile mile of a use that handles or stores large quantities of hazardous or <br /> acutely hazardous material,substances, or waste; <br /> • Within one-quarter-mile mile of a freeway,busy traffic corridor, large agricultural operation, or <br /> rail yard that emits hazardous emissions or handles hazardous or acutely hazardous materials;or <br /> • Within 500 feet of a freeway or busy traffic corridor where short-or long-term exposure to <br /> associated traffic air emissions poses a significant health risk. <br /> Locate habitable structures within a natural gas or crude oil pipeline"no habitable structure"zone as <br /> de£med by a pipeline risk assessment; or <br /> • Locate a school site less than 150 feet from 230 kVA electrical lines. <br /> 4.9.4 IMPACT ANALYSIS <br /> ANALYSIS METHODOLOGY <br /> This section has been prepared based on: two Phase I Environmental Site Assessments prepared for the <br /> proposed project by ENGEO,Inc. dated April 15, 2004 and November 2,2004; a Pipeline Risk <br /> assessment prepared for the proposed project by J House Environmental dated June 2004; and <br /> independent research and analysis on EMFs. See the beginning of this section,the Phase I ESA, and the <br /> Pipeline Risk assessment,for further discussion. <br /> Previous environmental studies reviewed for this analysis are listed below: <br /> • Final EIR for the Mountain House Master Plan and Specific Plan I(SJCCC, September 1994). <br /> Draft Supplemental EIR for the Delta College Center at Mountain House(San Joaquin Delta College <br /> District, September 2001). <br /> Mountain House Parkway Phase I ESA (Kleinfelder,Inc.,November 12,2002). <br /> Mountain House Parkway Soil Sampling and Analysis(Kleinfelder,Inc.,July 28,2003). <br /> Delta College at Mountain House Phase I ESA (Levine Fricke, June 29, 2001). <br /> • Mountain House Muela, Tuso, and Teixeira Property Environmental Assessments(Wallace Kuhl& <br /> Assoc.,Inc.,June 2,2003). <br /> ` The studies above are available for public review at the San Joaquin County Community Development <br /> Department, 1810 East Hazelton Avenue, Stockton,California 95205. <br /> IMPACTS AND MITIGATION MEASURES <br /> o• The Initial Study(IS)prepared for the proposed project found that minor amounts of hazardous materials <br /> could be used on the project site during project construction.Construction activities would be subject to <br /> federal, state, and local laws, requirements and permits designed to minimize and avoid the potential <br /> health and safety risks associated with hazardous materials.Furthermore, a Stormwater Pollution <br /> Prevention Plan(SWPPP)would be required of developers within the Specific Plan III site and would <br /> outline methods to protect against the accidental release of construction-related chemicals into site runoff. <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.9-27 Public Health and Safety <br />