Laserfiche WebLink
Covert, C. MacKay& Somps. December 20, 2004—personal communication with John Hope of EDAW <br /> regarding wrong off-site drainage number, existing versus developed on-site drainage calculations (focus <br /> on watershed A),and expansion of WQB 1. <br /> EDAW. 2004. College Park at Mountain House New Community Specific Plan III. <br /> MacKay& Somps. 2004 (November). Specific Plan III Amendment to the Stormwater Master Plan Update. <br /> Prepared for Mountain House Community Services District. <br /> 2005 (January 4).Draft Initial Study, Mountain House Specific Plan 11. Prepared by Amy Skewes-Cox. <br /> MHCSD. See Mountain House Community Services District. <br /> Mountain House Community Services District. 2003 (May 27).Mountain House Stormwater Master Drainage <br /> Plan Update. Prepared for MHCSD by Pacific Advanced Civil Engineering, Inc. (Pace). <br /> Pacific Advanced Civil Engineering(PACE).2003. Mountain House Storm Water Master Plan Update <br /> San Joaquin Delta Community College District. 2001 (September).Draft Supplemental Environmental Impact <br /> Report, Delta College Center at Mountain House. <br /> San Joaquin County Community Development Department. 1994 (September).Final Environmental impact _ <br /> Report, Mountain House Master Plan and Specific Plan I Prepared for San Joaquin County by Baseline <br /> Environmental Consulting. <br /> . 2000 (September 12).Mountain House New Community Master Plan. <br /> . 2004a(December 22). College Park at Mountain House Specific Plan III. Prepared for San Joaquin <br /> County by EDAW. <br /> SJCCDD. See San Joaquin County Community Development Department. <br /> SJDCC.See San Joaquin Delta College District. <br /> SJDCCD. See San Joaquin Delta Community College District. <br /> USACE.See U.S.Army Corps of Engineers. <br /> U.S.Army Corps of Engineers and State of California Reclamation Board. 2002 (December 20).Sacramento and <br /> San Joaquin River Basins California Comprehensive Study, Interim Report.http://www.compstudy.org/ <br /> docs/interimreport2002l 220/inteiimrpt-part0l.pdf. <br /> 4.8 WATER QUALITY <br /> California Bay-Delta Authority. 2003 (July).Environmental Water Account–Draft EIR/EIS. Sacramento,CA. <br /> Larry Walker Associates. 1997 (September). Technical Report Assessing the Attainability of Water Quality <br /> Criteria Proposed in the California Toxic Rule, County of Sacramento. <br /> 1998 (April).Fresno Basin "C"Data Analysis. <br /> 1999(September). City of Davis Pollution Load Reduction Program (1994-99), Final Report. <br /> EDAW College Park at Mountain House Specific Plan III DEIR <br /> References 8-6 San Joaquin County <br />