Laserfiche WebLink
My <br /> � a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> lmplementatian lmpfementatlan&Verificatieon <br /> Mitigation Measure TiminglSehedule Responsibility Ammon Date <br /> Completed <br /> 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> In accordance with the California Health and Safety developer,and in <br /> Code,if human remains are uncovered during conjunction with <br /> construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> STCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> Inman remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> Q, 7050.5[bj).If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the NAVe American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> determination(HSC Section 7050[0 }.Once Ai'Most <br /> Likely Descendent(MLD)has been designated by the <br /> <uf NAHC,the MID,in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> The'responsbilides of the County for acting upon <br /> notifitation of a discovery of Native American human <br /> remains are outlined in detail in the PRC Section <br /> 5097.9.Meas> likely resulting from the above <br /> could mchidc pu rvation in place sum <br /> capping/avoidance,'or removal and continued <br /> monitoring of ground-disturbing activities. <br /> �- 4.7 DRAINAGE <br /> 4.7-2 Drainage—Result In Flooding or Exceed the Before construction MHCSD,in . <br /> Capacity of the Storm-drain System conjuruetkm with the <br /> The College Park developers shall expand WQBI as developer <br /> required to accommodate runoff from the College <br /> Park project,or shall provide the required.on-site <br />