Laserfiche WebLink
M <br /> n <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Miti99m Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> doting coaasilruction that could be present in <br /> storn water drainage and non-stormwater <br /> discharges; <br /> < Specify BMP inspection prot000b to ensure that <br /> the BWs are effective and ensure that the <br /> monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identifj-constructiontechniques that will reduce <br /> thepotential for runoff; <br /> < Identify the erosion and sedunentati:on control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> hazardous matenals used for equipment ' <br /> operation and hazardous waste; <br /> < Identify emergency procedures for.responding to <br /> spills; <br /> < Identify BMWs that shall be used in all <br /> subsequ l site-development activities; <br /> < Identify personnel training requirements and <br /> procedures that will.be used to gasure that <br /> workers are aware of pennitrrequiremerts and <br /> ` proper i stallation and performance inspection <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> supervisory duties related to implemertatior of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br />