Laserfiche WebLink
College Park at Monntaf►Home Spedit Pian III <br /> Midlon Monitoring and Reportiag Program <br /> Implementation&Verification <br /> Ot <br /> Mitigation Measure Timing/ftedule Implementation pate <br /> +lI► Acfion Completed <br /> 3 Health Department shall identify"no further <br /> aa/c/t�i�o6nvsereWW b�eif{afe project construction <br /> -access atV*.�l�*locations. - <br /> < Phase I.Snv fial Site Assesswat(ESM) <br /> shall be-prepared by qualified hazardous materials <br /> experts far areas in Grant.Lioe.Village that are the <br /> subject of future development proposals.before <br /> co ttuctron in these areas The Ms shalf be <br /> reviewed and approved by Ow County, <br /> Em Aealth Department.Any <br /> recoo,mendati--'made inn the ESAs'(monitoring, <br /> Phase H testing,,mitigation,etc.)shall be <br /> i <br /> impleted. <br /> < Project grading,excavation,,and.pfl er earth- <br /> moving activtieA directly adjacent to the off.-site <br /> parcel where the December 4,2003 crude oil <br /> release took place shall not occur until it has been <br /> verified,either by the assessment currently being <br /> e� <br /> co by IZWQCB or separate soil and <br /> group lwatex sainp ng co iiissioaned by the <br /> College Park' velopers,that the contamination <br /> associated with the.incident has not InIgrateil to <br /> the College Parr site.If the contamination has <br /> migrated to the College Pgrk site,it shall be fully <br /> remediated to the satisf cin bf ilia County <br /> Environmental Health Dint begone project <br /> construction activities in the contanminated arca. <br /> < Project construction activities at hazardous <br /> materials sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of the E1R)shall occur only after <br /> M any contamination that may exist at these sites has <br /> a been fully remediated to the satisfaction of the_, <br /> County Environmental Health Department,the <br /> status of the sites has been changed to"no further <br />