Laserfiche WebLink
College Park at Mountain House specific Pian III <br /> Midgation Monitoring and Repordug,Progmm <br /> � Implementation lmplemen�tion&Verifrcation <br /> Mitigation Measure TiminglSchedule l�esponsibili y Aeon Date <br /> Completed <br /> shall be reviewed and approved by CDE,DTSC, <br /> the SJCCDD,and the Lammersville School <br /> District.If these agencies determine,based on the <br /> PEA,that the school site does not meet CDE <br /> siting=W=ments,the proposed school shall be <br /> developed at a different location within the: <br /> College Park site,subject to clearance by a new. <br /> � PEA to be fundod by the developers.If the new <br /> school site is required,the devekgers shall be <br /> responsible for processing the regtmed <br /> amendment to_the College Park Specific-Pt=III <br /> and obtaining and dedicating the new school site <br /> to the school district.The assessment end analysis <br /> would be conducted in accordance with CDE <br /> reTiremenisWand would be under separate CEQA <br /> documentation. <br /> 4.9-5 Public Health and Safety Exposure to Pipeline During design phase SJCCDD,in <br /> K Hazards conjunction with the <br /> The following measures sbail be implemented by the developer <br /> o College Park developersc <br /> < No habitable residential strictures(Le.,homes, <br /> ale,SAY ftffi,garages converted to <br /> living quarters,natio rooms,sun rooms)shall be <br /> = permitted within 68 feet of the PG&E--Chevron <br /> m pipeline that bisects the College Park site and <br /> contains Pipelines L401,L00Z ad CSDF 0499. <br /> Alternatively,no habitable residential structures <br /> as defined above shall be permitted within 68 <br /> feet of the nearest pipeline in the PG&E <br /> easement.Outdoor structures such as pools, <br /> M fences,patios,and decks could be allowed within <br /> the no build zone,since occupancy would be less <br /> than 1040/a.Garages would be permitted as long <br />