Laserfiche WebLink
Cope Park at Mountain House.spume Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Ot Mitigation Measure Timing/Schedule I <br /> Responsibility eritatoAction <br /> Date <br /> Completed <br /> described in Section.5.2.2.5 of the&WSCP. <br /> If special-statrrs plants are found,the following <br /> mawmes shall be implemented,depending on.the <br /> CO <br /> species�otmd: <br /> R 's arrowhead.Delta button-celer,. <br /> gad. titer'lam SJMSCP regeuro <br /> C+ complete avw ance.fcx these species;therefore, <br /> : poteaW impacts on these spocies could not be <br /> covered through participation in the plan.If these <br /> species are present in the project area and camrot <br /> be.aVoided,a separate consultation with the <br /> appropriate regulatory agencies(likely California <br /> Department of Fish and Game[DFGD would be <br /> rewiTed..INS consultation shall delerz*e <br /> appropriate mitigation measures for any <br /> populations affected by the prqject�:such as <br /> creation of off-site.populations through.seed <br /> collection or.trauVbntiztg,preserving and <br /> enhancing existing pilations,or restoring or <br /> creating suitable habitat in sufficient quantities to <br /> compenstate.for the inVoa All mitigation <br /> measures deb4;nined necessary during this,, <br /> consultation shall bq implemented by the project <br /> . prop. e <br /> a <br /> 'I7rese species an <br /> considered widely,distributed species by tie <br /> SJMSCF,and dedication of conservation <br /> i} easements is the preferred option for mitigation. <br /> c� If these species are.found in the project area,the <br /> possibility of establishing a conservation <br /> M <br /> easement or in-lieu]and dedication shall be <br /> evaluated.If neither establishment of a <br /> conservation easement nor in-lieu land <br />