Laserfiche WebLink
�aiiege Park at Moan#ain House Speelfic Plan III <br /> . � oa Monitoring and Rcporting Progxam <br /> lmplementafion Implementation&Verification <br /> WNW Mime TninglSche" Responsibility Action Date <br /> Completed <br /> below: <br /> Spedal-Status Plants Before constriction SJCOG,in <br /> < Before any gmund_disturbing or vegetation consultation with <br /> C.0 clew activities,a q lifted botamst.shall USFWS and DFG <br /> conduct surveys for the.special-status plant. <br /> species identified in Table 4.11-1 of the lEM <br /> -a Survey$shall be conducted at the appropriate <br /> time,when the target species would be in flower <br /> and therefore clearly identifiable(ie.,blooming <br /> period).w d in all areas of suitable habitat that <br /> woutd.potentially be disturbed.IfnD specW- <br /> ro stalks plants.are found,no further mitigation <br /> C.A shall be requiied. <br /> • If special-status planta are found and the <br /> populations can be avoided during project <br /> in�plementa#o�n,they shall be clearly marked <br /> in the field by a qualified botanist for <br /> avoidance during construction activities <br /> • If special-status plant populations.cannot be <br /> o avoided,,consultations with DFlG,mp&or,, <br /> USFWS maybe required,d ,on the <br /> listing status of the species presmt"These <br /> consultations shalt determine aplrtopriate <br /> mitigation me"ures for any populations that <br /> would be affecW by the implementation of <br /> the proposed project,Appropriate measures <br /> may include the creation of off-site <br /> populations through seed collection or <br /> transplanting,preservation and enhancement <br /> of existing populations,or restoration or <br /> m creation of suitable habitat in sufficient . <br /> v <br /> quantities to compensate for the impact, <br /> California Red-Legged Frog Before construction SJCOG,in <br />