Laserfiche WebLink
Colhge Paris at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&VerlfmWn <br /> Mftsion Measure Timing/Schedule lResponsibility Action Dade <br /> Completed <br /> biologist within the 2 weeks before conatiuction <br /> or tree removal begins.If no active nests are <br /> found,no Ai tlr mimmation shall be required <br /> < If active nests are found,impacts shall be <br /> avoided by establishment of apprapriate.buffers. <br /> No project activity shell commence withiu the . <br /> buffer area until a qualified biologist conbrms <br /> Ow the nest is no loegor active..DFG.guidelines <br /> recommend' of 0.25-or 0.5-utile <br /> buffers,but.the size of the buffer may be adjusted <br /> if a gt, <br /> "ed biologist and DFG determine it <br /> would not be likely to adversely affect the nest . <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely must the nest. <br /> Burrowing Owl Before construction SJCOG,in <br /> < Before project activity,focused surveys for. consultation with DFG <br /> burrowing owls shall be conducted by a qualified <br /> biologist in amps of suitable habitat on aW, <br /> within 250 fed of the project site.Surveys shall <br /> be-cwi�x d in accor?dance with DFG protocols <br /> (DFG 1095). <br /> < if no occupied burrows are;found in the survey <br /> area,a letter report documentingsurvey methods <br /> and findings shall be submiftd.to DFG,and no <br /> further mitigation is necessary.. <br /> < If an occupied burrow with an active nest is <br /> found,impacts shall be minimized by <br /> establishing a 250-foot buffer area around the <br /> burrow.No project activity shall occur within the <br /> M buffer area until a qualified biologist confirms <br /> that the nest is no longer active.The size of the <br /> buffer area may be adjusted if a qualified <br />