Laserfiche WebLink
� m <br /> n <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule ImplemResponsientation <br /> Action Date <br /> Completed- <br /> at least 5 consecutive days from the time of the <br /> observation,to allow anykit,fox occupying the <br /> den to.move to another,location.If it is not a natal <br /> or pupping den,use of the den can be discouraged <br /> a� during this period by partially plugging its <br /> entrance(s)with soil in such a manner that any . <br /> animal can escape easily.The den maybe <br /> destroyed when,m the judgment of a qualified <br /> biologist,it is no longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destruction <br /> shall be in accordance with USFWS <br /> recommendations. <br /> c < Occupied natal or pupping dens shall not be. <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS.A 250-foot buffer zone shall be <br /> maintained around natal dents until the biologist <br /> determines that the den has been vacated. <br /> • Additionalprovisions of the Standardized, . <br /> Becommendations for Protection of the 5ait' <br /> Joaquin Kit Fox Before or During Ground <br /> Disturbance(USFWS 1999),including those <br /> for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> for ldt fox occupation fluting construction, <br /> shall also be implemented. <br /> Jurisdictional Waters of the United States Before Construction SJCOG,in <br /> The College Park.Developers shall implement coordination with <br /> Mitigation Measure 4.10-10. DFG,USACE and/or <br /> RWQCB <br /> 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />