Laserfiche WebLink
College Park at Mountain Haase Specinc Plan III <br /> b Mldpfion Monitoring and Reporting Program <br /> Implementation&Verification <br /> Ot Mitigation Measure Timing/Schedule Imipmentafm Data <br /> Resi:msib33 ft ' cOon Completed <br /> �. 4.13. NOISE <br /> 4.13-1 Noise--Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> y < Utnit project construction activities to the hours developer <br /> between 6.00 S.W.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Develbpmeio 6 f& <br /> &c activities. <br /> < Equpaly Maori vehicles or ecpiparcnt, <br /> Eared`or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds,in accordance with manufacturers <br /> < Arrsnp all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> reside". <br /> < Locate stationary construction equipment and <br /> staging Ow as far as popilble from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> installed around stationary equipment,if <br /> necessary- <br /> 4.13-2 NoI96--Generation of New Stadenary-Source During design phase SJCCDD,in <br /> Noise and during conimcdon with the <br /> The project applicants shall incorporate the measures construction developer <br /> identified below into the project design. <br /> Commercial,Office,and Industrial Uses <br /> Industrial and coial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outd war oqu4neut does not result in an <br /> exceedance of 55 dBA I q during daytime hours <br /> M (7:00 a m.to 10:00 p.m.)or 50 dBA I q during <br /> nighttime hours(10:00 p.m to 7:00 a.m)at off-site <br /> noise-sensitive receptors.In addition,design and <br />