Laserfiche WebLink
g: rn <br /> = v <br /> n <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o <br /> co —I piementation&-VerifcatiUn-- <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility DateAction <br /> Completed <br /> Q ► Before project activity,USFWS shall be consultation with <br /> consulted to determine whether widening of USFWS <br /> CD <br /> o Grant Line Road has potential to adversely affect <br /> California red-legged frog.It may be necessary <br /> ca to conduct a formal habitat assessment and <br /> v surveys to make such a determination.If it is <br /> i3 <br /> m determined that adverse effects are unlikely to <br /> occur,no further mitigation shall be required. <br /> < If it is determined that adverse effects to <br /> California red-legged frog could occur, <br /> consultation with USFWS shall be conducted,and <br /> authorization for incidental take could be required. <br /> rn Specific mitigation measures would be developed <br /> during the consultation process.Measures <br /> designed to avoid and minimize take to the <br /> greatest extent feasible shall be developed and <br /> o implemented.These may include limiting <br /> activities to certain seasons,minimizing <br /> cn vegetation removal and in-water construction <br /> activities,conducting pre-construction surveys, <br /> and conducting daily surveys and monitoring of <br /> a construction areas.If necessary,appropriate <br /> c compensation for loss of habitat and other adverse <br /> effects would also be developed.This could <br /> include measures such as enhancement of existing <br /> = habitat and creation of additional habitat. <br /> rn Swainson's Hawk Before construction SJCOG,in <br /> 0 .0 <br /> C Cn < If project construction begins during the (surveys shall be consultation with DFG <br /> c 0 Swainson's Hawk nesting season,as defined by conducted 2 weeks <br /> g DFG(March 1 to September 15),pre-construction prior to construction <br /> on surveys shall be conducted in areas of suitable activities) <br /> nesting habitat within 0.5 mile of project activity. <br /> Surveys shall be conducted by a qualified <br />