My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006457
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600643
>
SU0006457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 8:55:10 AM
Creation date
9/5/2019 10:44:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006457
PE
2638
FACILITY_NAME
PA-0600643
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600643\SU0006457\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
= 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> oImplementation&Verification <br /> 6 Mitigation Measure TiminglSchedule Implementation <br /> Responsibility Action <br /> Completed <br /> c biologist and DFG determine it would not be <br /> likely to adversely affect the nesting pair.DFG <br /> C° shall also be consulted to determine if it is <br /> necessary to temporarily preserve foraging <br /> c� habitat(in addition to the buffer area)until the <br /> onest is no longer active. <br /> cQ < If feasible,250-foot buffer areas shall also be <br /> established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary.Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> co <br /> alternative burrows outside the impact area,or <br /> capture and movement of owls to specific <br /> 'mitigation sites. <br /> o Other Nesting Raptors Before construction SJCOG,in <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting season(February 15 to August 31),pre- conducted 2 weeks <br /> � construction surveys shall be conducted by a prior to construction <br /> qualified biologist in areas of suitable nesting activities) <br /> habitat within 500 feet of project activity. Surveys <br /> shall be conducted within 2 weeks before the <br /> � <br /> beginningof construction or tree removal. If no <br /> active nests are found,no further mitigation shall <br /> c be required. <br /> Cn <br /> CD < If active nests are found,impacts shall be avoided <br /> C- o by establishment of appropriate buffers.No <br /> C° project activity shall commence within the buffer <br /> C5 area until a qualified biologist confirms that the <br /> o nest is no longer active.DFG guidelines <br /> recommend implementation of 500-foot buffers, <br /> 'Z = but the size of the buffer may be adjusted if a <br />
The URL can be used to link to this page
Your browser does not support the video tag.