Laserfiche WebLink
� m <br /> r.: D <br /> oCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> cc) - - - - – <br /> Implementation Implementation&Verification <br /> 0 Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> co Completed <br /> 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD,in <br /> X exceeding Predicted Noise Levels conjunction with the <br /> `D The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> CO < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> 0 <br /> the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm, or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> UCD below 65 dBA L&/CNEL and as close to 60 dBA <br /> rn Ld„CNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> a� <br /> College Park developers. <br /> 0 <br /> c <br /> 0 <br /> as <br /> 3' <br /> z <br /> m ai <br /> CD <br /> o -0 <br /> m m <br /> � n <br /> C7 � <br /> 0 ay <br /> c 0 <br /> �c = <br />