Laserfiche WebLink
Ezm <br /> ;W 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Responsibility Action Date <br /> Completed <br /> in <br /> o. 4.24 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> `D Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> cQ mitigation measure: <br /> o < At such time as the interim land disposal of <br /> ca treated wastewater at the Pombo property is <br /> discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> 4h- < Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> C-) water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> cn irrigation canals shall be approved by BBID. <br /> CD <br /> -0 4,6 CULTURAL RESOURCES <br /> 51L 4.6-2 Cultural Resources—Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> o Resources developer,and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> X the construction site where the discovery was made archaeologist,if <br /> CD <br /> C shall be halted.The College Park developers or needed. <br /> fD <br /> 0 construction contractor shall contact the San Joaquin <br /> � <br /> rn County Community Development Department <br /> c ; (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />