Laserfiche WebLink
R: m <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> � — -- - - Impleme6fation&Verifications -` <br /> R. Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Completed <br /> omPleted <br /> ea <br /> Qaction required"in the regulatory agency <br /> databases,and the facilities that are the source of <br /> CD <br /> any contamination have been removed in <br /> accordance with applicable regulations.The <br /> cc project developers may attempt to advance the <br /> oabove,if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> the property owners and regulatory agencies,and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of <br /> structures on the project site and off-site <br /> infrastructure sites constructed before 1981 <br /> PQ (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> n experts to survey these buildings for asbestos and <br /> 0 <br /> lead-based paint.Demolition,renovation,or <br /> co modification of any structures identified as <br /> m containing asbestos or lead-based paint shall be <br /> RL performed by a licensed asbestos and lead-based <br /> paint abatement contractor in accordance with <br /> 0 applicable regulations. <br /> 4.94 Public Health and Safety---Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards . conjunction with the <br /> X < The College Park developers shall have a developer and a <br /> I Cl) rn preliminary Endangerment Assessment(PEA) qualified hazardous <br /> j C to prepared by a qualified hazardous materials materials expert;in <br /> CD consultant for the school located near the Lucky J consultation with CDE <br /> n <br /> 5 0 Dairy,if required by California Department of and DTSC <br /> I o Education(CDE). The PEA shall be prepared in <br />! accordance with CDE and Department of Toxic <br /> Z = Substances Control(DTSC)requirements and <br />