Laserfiche WebLink
Cnn <br /> m o <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> 0 Mitigation Monitoring and Reporting Program <br /> o � Implementation <br /> Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> N standards,the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east of Grant <br /> Cn <br /> ca <br /> Line Road. <br /> �. Because Byron Road is a major regional arterial <br /> 0 serving the area,the County shall extend <br /> ems—, implementation of Mountain House Master Plan <br /> (MHMP)BIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> K control measures during construction(see"Regulatory <br /> — Setting,"above). <br /> dna, The latest version of the San Joaquin Valley Air <br /> 0Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> 0 Mitigating Air Quality Impacts(SJVAPCD 199 8)and <br /> 0 repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> n the SJVAPCD to implement the current version of the <br /> measures at the time individual development <br /> applications are received by the County for <br /> development under College Park. <br /> 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> M Contaminants(TACs) begins and during conjunction with the <br /> 3 ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />