Laserfiche WebLink
W 0 <br /> M o <br /> W m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> R Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation Date <br /> 5 Responsibility Action <br /> Completed <br /> 4.13. NOISE <br /> 0 4.13-1 Noise-Generation of Temporary Construction During construction SJCCDD,in <br /> 0 Noise conjunction with the <br /> W < Limit project construction activities to the hours developer <br /> mbetween 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> -� Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds,in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. . <br /> < Locate stationary construction equipment and <br /> stagiiig areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> installed around stationary equipment,if <br /> o necessary. <br /> 0 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> a Noise and during conjunction with the <br /> E. The project applicants shall incorporate the measures construction developer <br /> n� <br /> identified below into the project design. <br /> CL Commercial,Office,and Industrial Uses <br /> rn <br /> � Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> a exceedance of 55 dBA Leq during daytime hours <br /> cQ p (7:00 a.m.to 10:00 p.m.)or 50 dBA Lq during <br /> nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />