Laserfiche WebLink
cn 0 <br /> a� o <br /> CD <br /> CD College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 5Implementation&Verification <br /> Q r• Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 4' 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> = Mountain House Parkway construction <br /> CThe following measures shall be implemented by the <br /> m College Park developers: <br /> Cn <br /> If the landscaping and edge treatments required <br /> CD <br /> by the MHMP and MHCSD Design Manual have <br /> 13 <br /> not been developed on the east side of Mountain <br /> House Parkway fronting the Pombo property by <br /> _ Speck Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> o development of the pond. <br /> 0 <br /> n� <br /> CD <br /> a <br /> c� <br /> o rn <br />