Laserfiche WebLink
W 0 <br /> m o <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> S. COi Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> Action <br /> Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture--Conflict with Existing Before and during San Joaquin County <br /> 0 Land Uses construction, and Community <br /> CD <br /> -a The College Park developers shall implement the During design phase Development <br /> following measures: Department <br /> < Pence off the two on-site Byron-Bethany (SJCCDD), in <br /> -0 Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer, and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5, identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> v gas pipelines within the PG&E—Chevron <br /> 0 easement that bisects the project site. <br /> K < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> line. <br /> Q. <br /> m <br /> b <br /> 0 <br /> ccs <br /> 3 m <br /> CO C) <br />