Laserfiche WebLink
FZM <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> n4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> CD <br /> 8 In accordance with the California Health and Safety developer,and in <br /> Code,if human remains are uncovered during conjunction with <br /> cn construction at the project site,the College Park qualified archaeologist <br /> developer or construction contractor shall immediately and County Coroner, <br /> 23 <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSC Section <br /> 6, 7050.5[b]).If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> o determination(HSC Section 7050[c]).Once a Most <br /> CD Likely Descendent(MLD)has been designated by the <br /> m NAHC,the MLD,in consultation with the County, <br /> CU shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC Section <br /> 5097.9.Measures likely resulting from the above <br /> could include preservation in place and <br /> = capping/avoidance,or removal and continued <br /> m monitoring of ground-disturbing activities. <br /> :3 m <br /> 0 0 4 .7 DRAINAGE <br /> CD 4.7-2 Drainage--Result in Flooding or Exceed the Before construction MHCSD,in <br /> Capacity of the Storm-drain System conjunction with the <br /> o <br /> The College Park developers shall expand WQB 1 as developer <br /> as <br /> �_ required to accommodate runoff from the College <br /> 'Z = Park project,or shall provide the required on-site <br />