Laserfiche WebLink
K rn <br /> 0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Timing/Schedule/Schedule Implementation Date <br /> o Mitigation Measure g Responsibility Action Completed <br /> maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD during construction that could be present in - <br /> stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> C� the BMPs are effective and ensure that the <br /> E3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> CO measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> C° <br /> u0 < Identify measures to prevent or clean up spills of <br /> CD hazardous materials used for equipment <br /> operation and hazardous waste; <br /> RL <br /> < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> a subsequent site-development activities; <br /> 2 <br /> < Identify personnel training requirements and <br /> 0 procedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> C– <br /> . <br /> -0 proper installation and performance inspection <br /> CD <br /> 0. methods for specified BMPs; <br /> ' c < Identify the appropriate personnel responsible for <br /> d o ET ET supervisory duties related to implementation of <br />` the SWPPP;and <br />�I — < Require all construction contractors to retain a <br />