Laserfiche WebLink
m <br /> r: Q <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation <br /> o Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> Qaction required"in the regulatory agency <br /> databases,and the facilities that are the source of <br /> any contamination have been removed in <br /> accordance with applicable regulations.The <br /> cn project developers may attempt to advance the <br /> oabove,if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> the property owners and regulatory agencies,and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation,or modification of <br /> structures on the project site and off-site <br /> infrastructure sites constructed before 1981 <br /> N <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey these buildings for asbestos and <br /> m lead-based paint.Demolition,renovation,or <br /> rn modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> performed by a licensed asbestos and lead-based <br /> � paint abatement contractor in accordance with <br /> c applicable regulations. <br /> U 4.94 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in <br /> an Area of Potential Hazards conjunction with the <br /> 0 < The College Park developers shall have a developer and a <br /> M cuCn <br /> preliminary Endangerment Assessment(PEA) qualified hazardous <br /> C_ W prepared by a qualified hazardous materials materials expert;in <br /> w consultant for the school located near the Lucky J consultation with CDE <br /> a <br /> 8 Dairy,if required by California Department of and DTSC <br /> o -0 Education(CDE).The PEA shall be prepared in <br /> accordance with CDE and Department of Toxic <br /> Substances Control.(DTSC)requirements and <br />