Laserfiche WebLink
Cn C <br /> ai o <br /> mCollege Park at Mountain House Specific Plan III <br /> W Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> c Mitigation Measure Timing/Schedule Implementation Date <br /> = 5 Responsibility Action Completed <br /> employing one of several methods outlined in <br /> z Section 5.2.4.15 of the SJMSCP.These include <br /> Cretention of tall vegetation,regular discing of the <br /> CD site,or use of chemicals or traps to kill ground <br /> CO <br /> squirrels; <br /> CD <br /> 0. ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> m activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> m <br /> o During the breeding season(February 1 <br /> through August 31), occupied burrows shall <br /> K not be disturbed and shall be provided with a <br /> o' 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> a, concurrence of the permitting agencies' <br /> CL representatives on the Technical Advisory <br /> rn Committee,or a qualified biologist approved <br /> 0 by the permitting agencies,verifies through <br /> a noninvasive means that either(1)the birds <br /> C° have not begun egg laying or(2)juveniles <br /> cn mo from the occupied burrows are foraging <br /> @ y independently and are capable of <br /> independent survival.After the fledglings <br />