My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006458
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600644
>
SU0006458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 10:17:50 AM
Creation date
9/5/2019 10:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006458
PE
2637
FACILITY_NAME
PA-0600644
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600644\SU0006458\IMP PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Km <br /> :' 0 <br /> aCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> ? Implementation Implementation&Verification <br /> _: Mitigation Measure Timing/Schedule Responsibility Action <br /> Date <br /> Completed <br /> Ea <br /> aduring the nesting season(February 15–August <br /> 31),pre-construction surveys shall be conducted <br /> CDduring the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> Un activity.The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> 0 <br /> begins.If any active nests are found,a setback of <br /> p1 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> CD the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> m Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> RL w under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> o site supports suitable habitat for loggerhead shrike, <br /> W = <br /> California horned lark,or tricolored blackbird.If <br /> oC__ CnSJCOG determines suitable habitat is present on or <br /> W CD adjacent to a given project site,the following <br /> 5. SJMSCP incidental take avoidance and minimization <br /> o measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.