Laserfiche WebLink
� o <br /> � a <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Venncation <br /> �t fiAeasun9 �TiminglSchedu� s�b�i' Date <br /> Responsibility'ity Action <br /> Completed <br /> 4.13.4 Noise-•,CQn"dibflity,of Proposed Land Uses After construction SJCCDD,in . <br /> exceeding,Predicted Noise Lovels conjunction with the <br /> The College Bark developerashall.implement the developer,in <br /> following measures: consultation with a <br /> < Traffie Noise-Arterials.Before Qccupancy of qualified acoustical <br /> the first residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EK <br /> a sound bander shall be_constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> bean,or combination thereof.The exact location, <br /> height and character of the sound.barrier shall be <br /> determined by a noise consultant approvea,by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> proposed adjacent single-family residences to <br /> below 65 dBA Lb/CVEL and as close to 60 dBA <br /> eo Lm/CNEL as feasible.This.mitigation shall.be <br /> funded through fur-ahaare payments,by the <br /> College Park developers. <br /> 3' <br /> r <br />