Laserfiche WebLink
College Park at Mountain House Specific Plan III <br /> _ Mitigation Monitoring and Reporting Program <br /> a Implements w&Verification <br /> MiNadon Measure TWnglSchedule ImRnsi 14 Acdon Date <br /> Completed <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> c Mountain House Parkway construction <br /> 0 The following measures shalt be implemented by the <br /> C/) College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design.Manual have <br /> not been developed on the cast side of Mountain <br /> Housc Parkway fronting the Pombo property by <br /> Specific Plans I or H at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> CO vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-faciing pond berm shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> ° using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> rg development of the pond. <br /> a� <br /> cn <br /> � o <br />