Laserfiche WebLink
CoUW Park at Mountain House Spedit Plan III <br /> MI Won Monitoring and Reporting Program <br /> Implementation&Vedwfim <br /> M iga6on M uni TiminglSctiedule IResponsbfltyActiion Date <br /> Completd <br /> Health Dgmr m nt shall identify"no fuer W <br /> actions.reVirW- befote project construction <br /> aecess iittAhw locations. <br /> < Phase I BnvSid Assessment(PSAs) <br /> shalJCbc prepared by qualified hazardous materials <br /> experts for areas in Grant.Lim Village that are the <br /> sect of fugue development proposals before <br /> coag tri tion in these aieas.Ihe PSAs shall be <br /> reviewed and approved by the County,. <br /> Health Department.Any <br /> recommendations,,made ut the ESAs'(monitoring, <br /> Phase H testing,nutigation,etc.)shall be <br /> r. irnplems�nted. <br /> < Project grading,excavation,and other earth- <br /> moving activities.directly adjacent to the of--site <br /> parcel where the December 4,2003 crude oil <br /> release took place shall not occur until.it has been <br /> verified,either by the assessment currently being <br /> conducted by the RWQCB or separate soil and <br /> groundwater_WWW ng commissioned by the <br /> College Park developers,.that the contamination <br /> associated with the isrrcidenst has not r ng ftd to <br /> the"College Park site.If the contamination bas <br /> migrated to the College Prk site,it shall be fully <br /> remediated to the,satisfa 606 of&County <br /> Environmental Health Department before project <br /> construction activities in the costed area. <br /> < Project construction activities at hazardous <br /> materials sites#3 and 7(identified in Figure 4.9-2 <br /> and Table 4.9-1 of.the EIR)shall occur only after <br /> M any contamination that may exist at these sites has <br /> y been fully remediated to the satisfaction of taste:, <br /> County Environmental Health Department,the <br /> status of the sites has been changed to"no further <br />